Si Bo, Qin Jie, Qian Yingxin, Li Guoli, Zhou Guangen. PRESTRESS CONSTRUCTION TECHNOLOGY OF THE 11th NATIONAL GAMES TRAINING STADIUM AND MATING FACILITIES——NO.4 BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(12): 5-7. doi: 10.13204/j.gyjz200812002
Citation:
Si Bo, Qin Jie, Qian Yingxin, Li Guoli, Zhou Guangen. PRESTRESS CONSTRUCTION TECHNOLOGY OF THE 11th NATIONAL GAMES TRAINING STADIUM AND MATING FACILITIES——NO.4 BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(12): 5-7. doi: 10.13204/j.gyjz200812002
Si Bo, Qin Jie, Qian Yingxin, Li Guoli, Zhou Guangen. PRESTRESS CONSTRUCTION TECHNOLOGY OF THE 11th NATIONAL GAMES TRAINING STADIUM AND MATING FACILITIES——NO.4 BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(12): 5-7. doi: 10.13204/j.gyjz200812002
Citation:
Si Bo, Qin Jie, Qian Yingxin, Li Guoli, Zhou Guangen. PRESTRESS CONSTRUCTION TECHNOLOGY OF THE 11th NATIONAL GAMES TRAINING STADIUM AND MATING FACILITIES——NO.4 BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(12): 5-7. doi: 10.13204/j.gyjz200812002
The 11th National Games training stadium and mating facilitiesNo.4 building are one of the venues for the 11th National Games,for which large-span string truss structure is used. The accumulation of sliding by block is also used for the project. It is described the construction technology,combined with construction simulation calculation and measured results,the construction technology and characteristics of this structure are proposed,this project will be used for a reference to the construction of similar structures.