Wang Junjie, Hao Jiping, Zheng Jiang, Zhong Weihui, Xu Chongliang. CALCULATION AND ANALYSIS OF REINFORCED FLOOR FOR TRAVEL OF LARGE TRACK HOISTER[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(10): 118-120. doi: 10.13204/j.gyjz20081029
Citation:
Wang Junjie, Hao Jiping, Zheng Jiang, Zhong Weihui, Xu Chongliang. CALCULATION AND ANALYSIS OF REINFORCED FLOOR FOR TRAVEL OF LARGE TRACK HOISTER[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(10): 118-120. doi: 10.13204/j.gyjz20081029
Wang Junjie, Hao Jiping, Zheng Jiang, Zhong Weihui, Xu Chongliang. CALCULATION AND ANALYSIS OF REINFORCED FLOOR FOR TRAVEL OF LARGE TRACK HOISTER[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(10): 118-120. doi: 10.13204/j.gyjz20081029
Citation:
Wang Junjie, Hao Jiping, Zheng Jiang, Zhong Weihui, Xu Chongliang. CALCULATION AND ANALYSIS OF REINFORCED FLOOR FOR TRAVEL OF LARGE TRACK HOISTER[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(10): 118-120. doi: 10.13204/j.gyjz20081029
As the construction of steel structure of Guangzhou Opera House is very special,the builders adopt a 250t track hoister walking on the concrete floor to cooperate with tower cranes in hoisting and installation.So the concrete floor has to be reinforced.ANSYS is used to calculate the reinforced floor,whose results are contrasted with the site test data.The result of experiment is in accordance with the theoretical prediction.The method of analyzing reinforced floor is effective and will be worthful for construction.