Wang Xibang, Wang Yulin, Song Yingguo. THE STRUCTURAL REFORM AND REINFORCEMENT OF WELDING WORKSHOP IN AN AUTOMOBILE FACTORY[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(9): 38-41. doi: 10.13204/j.gyjz200809012
Citation:
Wang Xibang, Wang Yulin, Song Yingguo. THE STRUCTURAL REFORM AND REINFORCEMENT OF WELDING WORKSHOP IN AN AUTOMOBILE FACTORY[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(9): 38-41. doi: 10.13204/j.gyjz200809012
Wang Xibang, Wang Yulin, Song Yingguo. THE STRUCTURAL REFORM AND REINFORCEMENT OF WELDING WORKSHOP IN AN AUTOMOBILE FACTORY[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(9): 38-41. doi: 10.13204/j.gyjz200809012
Citation:
Wang Xibang, Wang Yulin, Song Yingguo. THE STRUCTURAL REFORM AND REINFORCEMENT OF WELDING WORKSHOP IN AN AUTOMOBILE FACTORY[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(9): 38-41. doi: 10.13204/j.gyjz200809012
It is introduced how to use light slab to solve the problem of high span seal, how to increase in cross-section of column to strengthen reinforced concrete column and how to use underpining technology solving the problem of brick wall removal during the technological reform of the welding workshop in an automobile factory,which may be a reference for old plant reconstructions.