Citation: | Yang Lijun, Wang Wei, Zai Jinmin. THREE-PARAMETER MODEL FOR TIME-DEPENDENT BEARING CAPACITY OF PREFORMED PILE IN SOFT SOIL[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(6): 54-57. doi: 10.13204/j.gyjz200806015 |
[2] Juan M Pestana,Christopher E Hunt,Jonathan D Bray. Soil Deformation and Excess Pore Pressure Field Around a Closed-Ended Pile[J].Journal of Geotechnical and Geoenvironmental Engineering,2002.1-11.
|
Chow F C,Jardine R J,Brucy F. Effects of Time on Capacity of Pipe Piles in Dense Marine Sand[J].Journal of Geotechnical and Geoenvironmental Engineering,1998,(03):254-264.doi: 10.1061/(ASCE)1090-0241(1998)124:3(254).
|
[3] Roy M,Blancher R,Tavenas F. Behavior of a Sensitive Clay During Pile Driving[J].Canadian Geotechnical Journal,1981.67-85.doi: 10.1139/t81-007.
|
[4] Fleming W G K,Elson W K. Pile Engineering[M].London:John Wiley Sons,1992.118-122.
|
[5] 张明义,时伟,王崇革. 静压桩极限承载力的时效性[J].岩石力学与工程学报,2002,(z2):2601-2604.doi: 10.3321/j.issn:1000-6915.2002.z2.066.
|
[6] 宰金珉,王伟,王旭东. 静压桩引起的超孔隙水压力及单桩极限承载力预测[J].岩土力学,2005,(11):1845-1848.
|
[7] 王伟,卢廷浩,宰金珉. 单桩极限承载力时间效应估算方法比较[J].岩土力学,2005,(zk):244-247.
|
[8] 叶为民,黄雨,唐益群. 饱和软土中打入式预制桩单桩承载力的时效[J].岩土力学,2000,(04):367-369.doi: 10.3969/j.issn.1000-7598.2000.04.014.
|
[9] Kondner R. Hyperbolic Stress-Strain Response:Cohesive Soils[J].Journal of Soil Mechanic and Foundation Engineering Division ASCE,1963,(SM1):115-143.
|
[10] 王伟. 基于能量耗散原理的土与结构接触面模型研究及应用[D].南京:河海大学,2006.
|