Chen Junyi, Zou Daoqin, Gan Gang. ANALYSIS OF UNBONDED PRESTRESSED TECHNIQUE IN CONTROLLING TEMPERATURE STRESS OF SUPER-LONG STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(3): 52-55,83. doi: 10.13204/j.gyjz200803015
Citation:
Chen Junyi, Zou Daoqin, Gan Gang. ANALYSIS OF UNBONDED PRESTRESSED TECHNIQUE IN CONTROLLING TEMPERATURE STRESS OF SUPER-LONG STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(3): 52-55,83. doi: 10.13204/j.gyjz200803015
Chen Junyi, Zou Daoqin, Gan Gang. ANALYSIS OF UNBONDED PRESTRESSED TECHNIQUE IN CONTROLLING TEMPERATURE STRESS OF SUPER-LONG STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(3): 52-55,83. doi: 10.13204/j.gyjz200803015
Citation:
Chen Junyi, Zou Daoqin, Gan Gang. ANALYSIS OF UNBONDED PRESTRESSED TECHNIQUE IN CONTROLLING TEMPERATURE STRESS OF SUPER-LONG STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(3): 52-55,83. doi: 10.13204/j.gyjz200803015
Based a typical super-long structure, the internal force and deformation of the structure under the function of linear unbonded prestressed tendons are analyzed by ANSYS, and the effect of the distributed unbonded prestress on controlling super-long structure temperature stress is also taken, whose results prove that it is more reasonable to place prestressed tendons in floorslab strip under column which should be partly tensioned, which can provide experience for similar projects.