Citation: | Wang Dongyan, Li Zhenbao, Hang Ying. EXPERIMENTAL RESEARCH ON UNBONDED POST-TENSIONED PRECAST CONCRETE BEAMS[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(2): 31-34,58. doi: 10.13204/j.gyjz200802011 |
[2] 李振宝, 董挺峰, 闫维明, 等. 混合连接装配式框架内节点抗震性能研究. 北京工业大学学报, 2006, 32 (10) : 895-900
|
董挺峰, 李振宝, 周锡元, 等. 无粘结预应力装配式框架内节点抗震性能研究. 北京工业大学学报, 2006, 32 (2) : 144-148
|
[3] Park R. The Design and Construction of Structural Concret e for Seismic Resistance. Proceedings of the 13th FIP Congress On Challenges for
|
Concrete in the Next Millennium, Amsterdam. 1998(2) : 873-878
|
[4] 董挺峰, 李振宝, 周锡元. 装配式混凝土框架结构及其抗震性能研究. 建筑技术, 2006, 37 (11) : 844-847
|
[5] Minehiro Nishiyama, Masato Adachi, Fumio Watanabe. Hysteretic Behavior of Precast Prestressed Concrete Beam-Column Assemblage.Proceedings of the 13th FIP Congress on Challenges for Concrete in the Next Millennium, Amsterdam. 1998(1) : 177-182
|
[6] Englekirk Robert E J. Development and Test ing of a Duct ile Connector for Assembling Precast Concrete Beams and Columns. PCI Journal, 1995, 40(2) : 36-51
|
[7] 林同炎. NED. BURNS. 预应力混凝土结构设计(第三版). 北京:中国铁道出版社, 1983: 152-180
|
[8] JGJ 140-2004 预应力混凝土结构抗震设计规程
|
JGJ 92-2004 无粘结预应力混凝土技术规程
|
[1] | Zhang Yuan. RESEARCH ON THE INTEGRATED TECHNIQUE OF CUTTING OFF COLUMNS AND JACKING OF BUILDING OR STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(12): 105-109. doi: 10.13204/j.gyjz200912026 |
[2] | Ren Xiaosong, Wang Song. PRACTICAL METHOD FOR ASEISMIC RELIABILITY ANALYSIS OF EXISTING MASONRY STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(7): 19-22. doi: 10.13204/j.gyjz200807005 |
[3] | Gao Huimin. DESIGN OF TO LANDSCAPE AND ENVIRONMENT OF INDUSTRIAL BUILDINGS OF MODERN IRON AND STEEL ENTERPRISES[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(9): 45-47. doi: 10.13204/j.gyjz200809014 |
[4] | Ren Xiaosong, Xu Qi. ASEISMIC RELIABILITY ANALYSIS OF EXISTING REINFORCED CONCRETE FRAME STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(5): 30-33. doi: 10.13204/j.gyjz200705008 |