Based on an inclined teaching building rectification in Shanghai, and through site observation and evaluation the authors analyse the reasons of the inclined building and present the scheme of using static blo-t pressing pile and drawing out soil in holes meanwhile reinforcing the foundation of the building, then briefly introduce construction process.By the analysis of local monitoring data, the building would be rectified back while the upside remained in safety so as to achieve anticipated effect.