[1] | CHEN Jian, YANG Gongbiao, WANG Zhikui, XIAN Guijun, KONG Deao. Research and Applications of FRP in Large-Diameter Shield Tunnel Engineering[J]. INDUSTRIAL CONSTRUCTION, 2024, 54(6): 54-60. doi: 10.3724/j.gyjzG24032001 |
[2] | LU Qingrui, JIN Xiuwei, LI Dongwei, CEHN Shijun, WANG Shuairu. Comparative Analysis on Ground Subsidence Above Entrances of Shield Tunnels by Horizontal Freezing[J]. INDUSTRIAL CONSTRUCTION, 2023, 53(11): 50-54,49. doi: 10.13204/j.gyjzG22070507 |
[3] | ZHOU Li. Dynamic Evaluation of Construction Safety Risk for Approaching Excavation of Shield Tunnel Undercrossing High-Speed Railway Based on Cloud Bayesian Network[J]. INDUSTRIAL CONSTRUCTION, 2023, 53(11): 226-233. doi: 10.13204/j.gyjzG22010711 |
[4] | LU Zhengzheng, CHENG Yuan, LI Pengfei, SONG Chao. Lateral Soil Spring Stiffness in Modal Analysis for Foundation of Centrifugal Hypergravity and Interdisciplinary Experiment Facility[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(7): 145-150. doi: 10.13204/j.gyjzG21071406 |
[5] | LI Ting, JIANG Annan, ZHANG Fengrui, ZHONG Yue, XU Bo. Effects of Jointed Rock Masses on Stability of Shield Tunnels Under Tunnelling and Ground Loss Rates[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(3): 29-37. doi: 10.13204/j.gyjzG21052114 |
[6] | WANG Hao, JIANG An-nan, ZHENG Shuai, LIU Lin-tao, ZHAO Ya-wei. Stability Analysis of Surrounding Rock Based on the Ubiquitous Joint Model[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(9): 193-197. doi: 10.13204/j.gyjzg21082515 |
[7] | Abdul Motalleb QAYTMAS, TIAN Yu, LU Dechun, DU Xiuli. INFLUENCE OF RELATIVE DENSITIES FOR SURROUNDING ROCKS ON STRATUM SUBSIDENCE DURING TUNNELLING[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(7): 11-17. doi: 10.13204/j.gyjzG20072217 |
[8] | LI Xue, WU Jiuqi, GENG Fengjuan, GENG Aopeng, ZHANG Yushen. CALCULATIONS OF LONGITUDINAL DEFORMATION FOR RIVER-CROSSING SHIELD TUNNELS INDUCED BY SCOUR IN DEEP CHANNEL SECTIONS[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(7): 6-10,38. doi: 10.13204/j.gyjzG20112306 |
[9] | CHEN Zhengfa, ZHANG Jie, YAN Zhiguo, BIAN Minghui. STUDY OF WATER AND EARTH PRESSURE MODES ON SHIELD TUNNELS IN WATER-RICH DIORITE STRATA[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(7): 25-30. doi: 10.13204/j.gyjzG21031806 |
[10] | LI Jianfei. SENSITIVITY ANALYSIS OF FACTORS EFFECTING 3D STABILITY OF SLOPES REINFORCED WITH ANTI-SLIDE PILES[J]. INDUSTRIAL CONSTRUCTION, 2021, 51(6): 156-164. doi: 10.13204/j.gyjzG19083102 |
[11] | LYU Min, HOU Wei, WANG Xuhong, YANG Qiuyu, LYU Tao, XIA Jiaguo, LI Yuxi, YIN Yue. ANALYSIS ON INSTALLATION SCHEMES FOR BACKFILL MATERIALS IN DISPOSAL DRIFTS OF GEOLOGICAL DISPOSAL REPOSITORIES FOR HIGH-LEVEL RADIOACTIVE WASTES IN CHINA[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(9): 21-24,74. doi: 10.13204/j.gyjzG20072114 |
[12] | TAO Yu, LIANG Weiqiao, FANG Wujun. RESEARCH ON THE STABILITY OF UNDERCROSSED SUBWAY SHIELD TUNNEL[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(4): 66-70. doi: 10.13204/j.gyjz202004012 |
[13] | Shao Guoxin. THE DESIGN AND CONSTRUCTION OF FREEZING METHOD OF CONNECTED AISLE FOR THE METRO SHIELD TUNNELS IN NINGBO SOFT SOIL STRATUM[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(11): 148-152. doi: 10.13204/j.gyjz201311033 |
[14] | Cai Jianguo, Wang Fenglan, Feng Jian, Zhang Jin. REVIEW OF THE KEY ELEMENT FOR PROGRESSIVE COLLAPSE OF STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(10): 85-89. doi: 10.13204/j.gyjz201110021 |
[15] | Liu Jifeng, Liu Bo, Zhang Huizhi. EXPERIMENTAL STUDY ON THE SHIELD TUNNELING-INDUCED SURFACE SETTLEMENT[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(3): 91-98. doi: 10.13204/j.gyjz201103018 |
[16] | Zhou Haiying, Chen Tingguo, Li Lixin. STUDY ON JOINT BENDING STIFFNESS AND INFLUENCING FACTORS OF METRO SHIELD TUNNELING LINING[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(7): 59-61,122. doi: 10.13204/j.gyjz201007016 |
[17] | Zhou Haiying, Chen Tingguo, Li Lixin. STUDY ON JOINT LOAD TEST OF METRO SHIELD TUNNELING LINING[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(4): 79-83. doi: 10.13204/j.gyjz201004018 |
[18] | Wei Gang. STUDY ON CALCULATION FOR WIDTH PARAMETER OF SURFACE SETTLEMENT TROUGH INDUCED BY SHIELD TUNNEL[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(12): 74-79. doi: 10.13204/j.gyjz200912019 |
[19] | Zhou Hongbo, Cai Laibing, Gao Wenjie. RISK IDENTIFICATION AND SENSITIVITY ANALYSIS OF LEAKAGE OF SLURRY WALL FOR DEEP EXCAVATIONS[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(4): 84-87. doi: 10.13204/j.gyjz200904019 |
[20] | Ma Baoguo, Luo Zhongtao, Wang Kai, Zou Dinghua, Wang Yingbin, Wang Xingang. THE MODEL OF CONCRETE DURABILITY FAILING WITH TIME-CALCULATION METHOD USED IN THE SERVICE-LIFE PREDICTION OF HILS[J]. INDUSTRIAL CONSTRUCTION, 2008, 38(11): 82-84,74. doi: 10.13204/j.gyjz200811020 |