[1] | LIU Weiran, GUO Shida, FANG Bin, YU Haifeng, WANG Jiawei, GAO Renqing, YE Xihao, HAN Jiantian. Research on the Mechanical Properties of Steel Truss Support Platform During the Construction of the Roof of a Large-Scale Silo[J]. INDUSTRIAL CONSTRUCTION, 2025, 55(2): 263-270. doi: 10.3724/j.gyjzG22031614 |
[2] | GUO Jinjie, SHI Zhongqi, KONG Xin, ZHOU Yanbing, FAN Hong, XU Liang, YUE Qingrui. Exploration and Practice of Full Life Cycle Safety Design for the Tower C of Shenzhen Bay Super Headquarters Base[J]. INDUSTRIAL CONSTRUCTION, 2023, 53(9): 156-161. doi: 10.13204/j.gyjzG23081402 |
[3] | ZHOU Yan-ling, CAO Da-fu, WANG Kun, GE Wen-jie, LIU Jia-qi. Analysis of Creep Effect of Prestressed Concrete Continuous Beam Bridge in Construction Process[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(9): 101-107. doi: 10.13204/j.gyjzg21060914 |
[4] | LIANG Yan, WEI Yingying, FENG Haoqi, ZHAO Ming, GUO Jing. Simulation Analysis on Construction Processes of Long-Span and Complex Steel Frames with Inclined Pillars[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(2): 75-80. doi: 10.13204/j.gyjzG201902180009 |
[5] | GAO Peng, GE Changwen, LIU Maofang, MENG Lei, YIN Zongcheng, WANG Zhiqiang, GAN Zhengyong, YANG Xuan, ZHU Jie. Numerical Analysis of Crack Resistance of Concrete Structure of Ultra-Long Round Stadium During Construction[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(10): 94-99,110. doi: 10.13204/j.gyjzG22073006 |
[6] | GAO Hui, CHEN Lei, GAN Mingyan, WEN Chuanliang, LIAO Biao, ZENG Zhiwen. CONSTRUCTION DEFORMATION CONTROL OF MEGA ASYMMETRICAL SUSPENDED PURE STEEL STRUCTURE TOWER[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(9): 181-185. doi: 10.13204/j.gyjzG19122008 |
[7] | HUANG Xin, LI Yi, ZHU Xudong, HU Xueying, LYU Yang. DAMAGE ANALYSIS OF HIGH-RISE BUILDING STRUCTURES WITH ASYMMETRIC VERTICAL SETBACKS UNDER RARE EARTHQUAKE ACTION[J]. INDUSTRIAL CONSTRUCTION, 2020, 50(6): 79-84. doi: 10.13204/j.gyjz202006013 |
[8] | Huo Runke, Li Maoda, Li Jing, Wang Qiang, Yan Jirui. NUMERICAL SIMULATION AND ANALYSIS OF TUNNEL CONSTRUCTION PROCESS OF UNSYMMETRICAL TUNNEL IN SOFT ROCK[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(2): 95-100. doi: 10.13204/j.gyjz201502021 |
[9] | Fan Feng, Zhi Xudong. FAILURE MECHANISM OF RETICULATED SHELLS SUBJECTED TO SEVERE EARTHQUAKES[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(1): 10-15. doi: 10.13204/j.gyjz201501002 |
[10] | Liu Yonghai. STUDY OF CONSTRUCTION TECHNOLOGY OF ARC CONCRETE FILLED STEEL TUBULAR COLUMN FOR NINGBO FORTUNE CENTER PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(5): 106-110. doi: 10.13204/j.gyjz201505023 |
[11] | Zhang Xibo, Wang Xiaoyang, Zhang Shaoheng, Yi Huiting, Yin Qingli. THE CONSTRUCTION TECHNOLOGY OF SUPER HIGH-RISE STEEL BUILDINGS WITH SECOND COLUMNS BEING UNDER THE TRUSS LAYER[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(1): 148-151. doi: 10.13204/j.gyjz201501030 |
[12] | Duan Hai, Wang Xiaoyang, Zhang Xibo. APPLICATION OF“DELAY CONNECTION”TECHNOLOGY OF OUTRIGGER TRUSS FOR SUPER TALL BUILDINGS IN MAIN TOWER OF SHENYANG HENGLONG PLAZA PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(11): 141-144. doi: 10.13204/j.gyjz2001411028 |
[13] | Chen Xu. STUDY ON FIELD MEASUREMENT OF HIGH-FORMWORK WITH A HEIGHT OF 15 m[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(8): 106-108. doi: 10.13204/j.gyjz201308023 |
[14] | Wang Chao, Luo Xiaoyong. FOUNDATION DESIGN OF A SUPER HIGH-RISE BUILDING WITH ENLARGED BASE[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(3): 142-146. doi: 10.13204/j.gyjz201303030 |
[15] | Xiong Xueyu, Cheng Chen, Li Yuan, LüPin. STUDY ON THE CONSTRUCTION PROCESS OF PRESTRESSED CONCRETE FRAME TAKING ACCOUNT OF THE IMPACT OF THE SECONDARY INTERNAL FORCE[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(12): 12-15. doi: 10.13204/j.gyjz201112003 |
[16] | Zheng Jiang, Hao Jiping, Li Cunliang, Yang Xiaoli, Wang Xiantie, Liu Shaowen. MECHANICS EMULATION AND ANALYSIS OF THE HESHI STUPA OF FAMEN TEMPLE DURING THE CONSTRUCTION PROCESS[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(10): 90-95. doi: 10.13204/j.gyjz200910022 |
[17] | Liu Xuewu, Guo Yanlin, Zhang Qinglin, Liu Luyu. ANALYSIS OF INTERNAL FORCE AND DEFORMATION FOR THE NEW CCTV HEADQUARTERS DURING THE CONSTRUCTION PROCESS[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(9): 22-29. doi: 10.13204/j.gyjz200709004 |
[18] | Mao Jinping, Xu Wei. RELIABILITY ANALYSIS OF ROCK- SOCKETED SUPPORT STRUCTURES WITH REAL- TIME DEFORMATION CONTROL[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(2): 42-44. doi: 10.13204/j.gyjz200602013 |
[19] | Liu An-jun, Gong Xiao-nan, Qian Guo-zhen. A NONLINEAR ANALYSIS OF COMBINED ACTIONS OF SOIL ANCHORS AND EARTH-RETAINING PILE WALL IN CONSIDERATION OF CONSTRUCTION STEPS[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(5): 74-78. doi: 10.13204/j.gyjz200605020 |
[20] | Guo Yanlin, Cui Xiaoqiang. KEY TECHNICAL PROBLEMS AND DISCUSSION IN CONSTRUCTION PROCESS OF LARGE SPAN STEEL STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(12): 1-5,22. doi: 10.13204/j.gyjz200412001 |