Citation: | Wang Xiaodun, Chen Zhihua, Zhao Jianbo, Yan Xiangyu. ANALYSIS OF A COMPOSITE STRUCTURAL SYSTEM COMPOSED OF CABLE STAYED BRIDGES WITH GIANT WHEELS[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(7): 89-91. doi: 10.13204/j.gyjz200707026 |
陆赐麟,尹思明,刘锡良.现代预应力钢结构.北京:人民交通出版社,2003
|
[2] 林元培.斜拉桥.北京:人民交通出版社,2004
|
[3] Kawaguchi M.Conceptual Design of Light Structure//IASS 2004 Symposium.Montpellier:2004
|
[1] | XUE Yong-jian, ZHU Xu-hui, WANG She-jiang, ZHANG Ya-yong, WU Feng, ZHAO Jin-hui. Construction Sequence Optimization of Overlap Shield Tunnel Beneath Water Supply Pipe in Close Distance[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(9): 219-223,146. doi: 10.13204/j.gyjzG22062508 |
[2] | CHEN Zhenming, LIANG Anrui, LI Jiyuan, ZHANG Jingzhou, FENG Ran, HUANG Shitao, JIANG Lei. Numerical Simulation Research on Demolition and Collapse of Space Truss Structures[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(10): 61-70. doi: 10.13204/j.gyjzG22042522 |
[4] | Liu Tianjie Xie Yingchuan He Yun, . EXPERIMENTAL STUDY OF THE NEW-TYPE HORIZONTAL FORMWORK OF FAST INSTALLATION AND EARLY DISMANTLING[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(6): 118-122. doi: 10.13204/j.gyjz201506023 |
[5] | Gao Kewei Li Yu Li Wen, . ANALYSIS OF COLLAPSE OF AN ALUMINUM ALLOY TRUSS STRUCTURE[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(7): 181-184. doi: 10.13204/j.gyjz201507036 |
[6] | Wu Xi, Yu Jisheng, Zhang Zhaoping, Fang Xingxing, Zhang Yulei, Chang Yongqiang. STUDY ON CONSTRUCTION SEQUENCE OF LARGE-SPAN BEAM STRING STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(12): 133-137. doi: 10.13204/j.gyjz201312025 |
[7] | Cai Wenhua, Liang Shuting, Yu Bujun, Gu Dasheng. ANALYSIS OF WHOLE COLLAPSE OF ADDING STORY FOR A WORKSHOP[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(2): 127-129. doi: 10.13204/j.gyjz201102029 |
[8] | She Buyin, Guo Zhengxing. STRUCTURAL SAFETY STRATEGIC THINKING AND DESIGN METHOD OF HIGH FORMWORK SUPPORT[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(1): 1-5,36. doi: 10.13204/j.gyjz201101001 |
[9] | Yang Xiaoming, Zhu Hongqiang, Xu Yue. COLLAPSE OF BOULEVARD DE LA CONCORDE OVERPASS IN CANADA[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(10): 23-25,135. doi: 10.13204/j.gyjz201010006 |
[10] | Ge Zhaoshen, Hu Changming, Shen Qin, Yin Hongbing. A STUDY ON EFFECT OF STRUCTURAL FACTORS ON STABILITY OF COUPLER STEEL TUBE FALSEWORK[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(2): 36-41. doi: 10.13204/j.gyjz201002009 |
[11] | Zeng Fankui, Hu Changming, Yan Xin, Dong Pan, Mei Yuan. EXPERIMENTAL STUDY ON STABILITY OF COUPLER STEEL TUBE FALSEWORK[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(2): 28-31. doi: 10.13204/j.gyjz201002007 |
[12] | Miao Jijun, Wang Junfu, Liu Yancun, Sun Gengqiang, Fan Xuechen, Wang Haifeng. THE CONSTRUCTION TECHNIQUE OF THE DYNAMITE DEMOLITION FOR QINGDAO RAILWAY BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(2): 128-131. doi: 10.13204/j.gyjz200902025 |
[13] | Wang Banqiao, Li Xunchang. ANALYSIS AND TREATMENT OF COLLAPSE ACCIDENT ON THE SOUTH SIDE OF FOUNDATION PIT FOR GEOLOGICAL SCIENTIFIC BUILDING IN CHANG'AN UNIVERSITY[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(9): 127-130. doi: 10.13204/j.gyjz200909029 |
[14] | Li Hongxing, Bai Guoliang, Lei Yisheng, Yue Jianguang. ANALYSIS ON A COLLAPSE ACCIDENTS OF ARCHED CORRUGATED STEEL ROOF[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(10): 112-114. doi: 10.13204/j.gyjz200710030 |