Xue Jianbin, Wei Huanwei, Sun Jianping, Zhao Kaozhong. COMBINED REINFORCEMENT DESIGN AND CONSTRUCTION OF STOCK YARD BUILDING OF A STEEL PLANT[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(6): 98-100. doi: 10.13204/j.gyjz200706025
Citation:
Xue Jianbin, Wei Huanwei, Sun Jianping, Zhao Kaozhong. COMBINED REINFORCEMENT DESIGN AND CONSTRUCTION OF STOCK YARD BUILDING OF A STEEL PLANT[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(6): 98-100. doi: 10.13204/j.gyjz200706025
Xue Jianbin, Wei Huanwei, Sun Jianping, Zhao Kaozhong. COMBINED REINFORCEMENT DESIGN AND CONSTRUCTION OF STOCK YARD BUILDING OF A STEEL PLANT[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(6): 98-100. doi: 10.13204/j.gyjz200706025
Citation:
Xue Jianbin, Wei Huanwei, Sun Jianping, Zhao Kaozhong. COMBINED REINFORCEMENT DESIGN AND CONSTRUCTION OF STOCK YARD BUILDING OF A STEEL PLANT[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(6): 98-100. doi: 10.13204/j.gyjz200706025
The workshop structure is damaged by constant over-load.According to the loading features of the structure of the workshop,the reasonable reinforcement measures are provided while its normal running is not affected,such as improving whole structure rigidity and reducing vertical and horizontal deformation,then its normal running in the future will be safely ensured.