Xu Ruilong, Qin Jie, Li Guoli, Qin Yang, Zhang Wei. THE BEAM STRING STRUCTURE CONSTRUCTION TECHNOLOGY OF THE OLYMPIC TRAINING STADIUM FOR THE NATIONAL OLYMPIC SPORTS CENTER[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(1): 26-29. doi: 10.13204/j.gyjz200701008
Citation:
Xu Ruilong, Qin Jie, Li Guoli, Qin Yang, Zhang Wei. THE BEAM STRING STRUCTURE CONSTRUCTION TECHNOLOGY OF THE OLYMPIC TRAINING STADIUM FOR THE NATIONAL OLYMPIC SPORTS CENTER[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(1): 26-29. doi: 10.13204/j.gyjz200701008
Xu Ruilong, Qin Jie, Li Guoli, Qin Yang, Zhang Wei. THE BEAM STRING STRUCTURE CONSTRUCTION TECHNOLOGY OF THE OLYMPIC TRAINING STADIUM FOR THE NATIONAL OLYMPIC SPORTS CENTER[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(1): 26-29. doi: 10.13204/j.gyjz200701008
Citation:
Xu Ruilong, Qin Jie, Li Guoli, Qin Yang, Zhang Wei. THE BEAM STRING STRUCTURE CONSTRUCTION TECHNOLOGY OF THE OLYMPIC TRAINING STADIUM FOR THE NATIONAL OLYMPIC SPORTS CENTER[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(1): 26-29. doi: 10.13204/j.gyjz200701008
The Olympic Training Stadium is built for 2008 Olympic Games.The beam string structure with viable span is used for the stadium.The steel structure and prestressing construction technology are described in detail.According to the construction simulation results and site construction monitoring result,the features of prestress and steel structure construction of the structure are proposed.