Core Chinese Journal
Source Journal of CSCD
Source Journal for Chinese Scientific and Technical Papers
Core Journal of RCCSE
Included in JST China
Included in the Hierarchical Directory of High-quality Technical Journals in Architecture Science Field
Volume 36 Issue 5
Dec.  2014
Turn off MathJax
Article Contents
Li Yan-ying, Wu Jing, Zhang Yu-ming. DISCUSSION ON PLACEMENT AND CLOSURE TIME OF POST-POURED STRIPS OF CONCRETE FLOOR STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(5): 27-29,78. doi: 10.13204/j.gyjz200605008
Citation: Li Yan-ying, Wu Jing, Zhang Yu-ming. DISCUSSION ON PLACEMENT AND CLOSURE TIME OF POST-POURED STRIPS OF CONCRETE FLOOR STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(5): 27-29,78. doi: 10.13204/j.gyjz200605008

DISCUSSION ON PLACEMENT AND CLOSURE TIME OF POST-POURED STRIPS OF CONCRETE FLOOR STRUCTURES

doi: 10.13204/j.gyjz200605008
  • Received Date: 2006-02-10
  • Publish Date: 2006-05-20
  • Post-poured strips are often placed to release most of the shrinkage strain for concrete floor structures.The distance between post-poured strips depends on stiffness of supporting structures,shrinkage value and closure time.The later is the closure time,the smaller is the continuous bar area and the greater the width is,the smaller the restraining tensile force in bars of post-poured strip will be.It is advantageous to realize the function of post-poured strip and strengthen its crack resistance.
  • loading
  • 王铁梦. 工程结构裂缝控制. 北京: 中国建筑工业出版社, 1997: 29-32
    李富民, 孟少平. 钢筋混凝土框架结构收缩缝间距计算. 中国矿业 大学学报,2005, 34(3): 274-277
    全学友, 孙会郎. 后浇带的设置方案对抗裂效果的影响. 建筑结 构,2004, 34(6): 22-24
    过镇海, 时旭东. 钢筋混凝土原理和分析. 北京: 清华大学出版社, 2003: 53-64
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (66) PDF downloads(149) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return