Sun Bingnan, LüChaokun, Mao Guodong. STMD CONTROL FOR SEISMIC RESPONSE OF TALL BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(7): 39-42. doi: 10.13204/j.gyjz200507012
Citation:
Sun Bingnan, LüChaokun, Mao Guodong. STMD CONTROL FOR SEISMIC RESPONSE OF TALL BUILDING[J]. INDUSTRIAL CONSTRUCTION , 2005, 35(7): 39-42. doi: 10.13204/j.gyjz200507012
Sun Bingnan, LüChaokun, Mao Guodong. STMD CONTROL FOR SEISMIC RESPONSE OF TALL BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(7): 39-42. doi: 10.13204/j.gyjz200507012
Citation:
Sun Bingnan, LüChaokun, Mao Guodong. STMD CONTROL FOR SEISMIC RESPONSE OF TALL BUILDING[J]. INDUSTRIAL CONSTRUCTION , 2005, 35(7): 39-42. doi: 10.13204/j.gyjz200507012
STMD CONTROL FOR SEISMIC RESPONSE OF TALL BUILDING
Received Date: 2004-07-15
Publish Date:
2005-07-20
Abstract
In order to control the seismic response of the tall building and eliminate the / time lag0 phenomenon by actuation of the control mechanism, intelligent TMD is proposed which consists ofMR dampers. The change of yield stress of MR fluids is in the same way of magnetic field. So the controlling force of the intelligent TMD can be adjusted by changing magnetic field. According to instantaneouw optimum control principle, we use the improved sem-i active control strategy which derived from the Hrovat and on- off control strategy to analyse the parameters of the MR dampers. An eight storied frame structure is analysed. From the numerical analysis, we can see the dvice could diminish the seismic response of a tall structure.
References
[2] Housner G W. Structural Control:Past, Present, and Future. ASCE, J. Engrg. Mech,1997,123(9):897~958
周福霖.工程结构减震控制.北京:地震出版社,1997
[3] 李忠献,张伟,姜忻良,等.高层建筑地震反应全反馈主动TMD控制理论研究.地震工程与工程振动,1997(9):60~65
[4] 隋莉莉,欧进萍.半主动磁流变减振驱动器的工作原理及应用.哈尔滨建筑大学学报,2002(6):9~19
[5] 瞿伟廉,王军武,徐幼麟,等.ER/MR智能阻尼器耦连的带裙房高层建筑结构地震反应的半主动控制.地震工程与工程振,2000(12):87~95
[6] Makris N Burton S N, Hill Detal. Analysis and Design of ER Damper for Seismic Protection of Structure. Journal of Engineering Mechanics,1996,122(10):1003~1011
[7] 周云,吴志远,梁兴文.磁流变阻尼器对高层建筑风振反应的半主动控制.地震工程与工程振动,2001(12):159~162
[8] Michael D S, Michael C C. Seismic Testing of a Building Structure with a Semi-Active Fluid Damper Control System.Earthquake Engng. Struct.Dyn,1997,26:759~777
Relative Articles
[1] ZHU Yangui. Discrete Element Method Analysis on Shear Responses of Mixed Soil During Anisotropic Consolidation [J]. INDUSTRIAL CONSTRUCTION, 2024, 54(3): 167-173. doi: 10.3724/j.gyjzG22062701
[2] LI Hao, WANG Dayang, ZHAO Dongzhuo, XIE Zhen. Shaking Table Tests and Numerical Simulation Study on the Centroid Eccentricity of the Center of Mass of Full-Frame-Supported High-Rise Building Structure with Thick Plate Transfer [J]. INDUSTRIAL CONSTRUCTION, 2024, 54(5): 141-149. doi: 10.3724/j.gyjzG23032007
[3] YANG Chao, ZOU Yongmu, LI Lei, ZHONG Zuliang, LI Yapeng. Research on Mechanisms of Water and Mud Inrush During Tunnelling in Deep and Large Fault Fracture Zones [J]. INDUSTRIAL CONSTRUCTION, 2023, 53(3): 173-179. doi: 10.12304/j.gyjzG22061409
[4] WU Qinghua. Analysis on Construction Responses of Rock Around Parallel Subway Tunnels in Inclined Stratification Rocks [J]. INDUSTRIAL CONSTRUCTION, 2023, 53(11): 29-35,87. doi: 10.13204/j.gyjzG22071706
[5] CAI Qingchi, XIE Hankang. A NUMERICAL METHOD FOR DETERMINING PRE-CONSOLIDATION PRESSURE [J]. INDUSTRIAL CONSTRUCTION, 2021, 51(5): 164-167,187. doi: 10.13204/j.gyjzG20061201
[6] ZHU Caihui, LI Yubo, LAN Kaijiang, HE Haonan. CREEP EFFECT OF LOESS STRATA ON SURROUNDING ROCK PRESSURE OF TUNNELS [J]. INDUSTRIAL CONSTRUCTION, 2021, 51(7): 18-24. doi: 10.13204/j.gyjzG20072901
[7] LI Tao, ZHU Baolong, LUO Bo, WANG Xiong, LI Xin. STUDY ON LOAD-BEARING CHARACTERISTICS OF PILES AND LINING STRUCTURE FOR TUNNELS IN TUNNEL-LANDSLIDE SYSTEMS WITH DIFFERENT SPACEINGS OF ANTI-SLIDE PILES [J]. INDUSTRIAL CONSTRUCTION, 2021, 51(7): 31-38. doi: 10.13204/j.gyjzG20040307
[8] WU Zhaofeng. INTELLIGENT FEEDBACK ANALYSIS OF FLUID-SOLID COUPLING ON ADJOINING ROCK OF TUNNELS IN RICH WATER ZONES BASED ON THE GP-DE METHOD [J]. INDUSTRIAL CONSTRUCTION, 2021, 51(2): 140-145,205. doi: 10.13204/j.gyjzG20031408
[10] Yang Ping. STABILITY ANALYSIS AND REINFORCEMENT TECHNOLOGY RESEARCH OF CHICKEN CLAW TRENCH HIGH ROCKFILL EMBANKMENT IN MOUNTAINOUS AREAS [J]. INDUSTRIAL CONSTRUCTION, 2015, 45(5): 166-173. doi: 10.13204/j.gyjz201505035
[11] Luo Bin. CONSTRUCTION METHOD FOR XIEJIADONG KARST CAVE INSIDE TUNNEL IN GUANGXI [J]. INDUSTRIAL CONSTRUCTION, 2014, 44(03): 129-133. doi: 10.13204/j.gyjz201403027
[12] Zhong Zuliang, Liu Xinrong, Fang Jinbing, Li Xiaoyong, Liao Jingwei. OPTIMIZATION RESEARCH ON TUNNEL CROSSING SCHEME THROUGH ULTRA-SHALLOW AND LARGE-BIAS SECTIONS BASED ON ECONOMIC SAFETY COEFFICIENT RATIO [J]. INDUSTRIAL CONSTRUCTION, 2013, 43(2): 78-82,171. doi: 10.13204/j.gyjz201302016
[13] Deng Tongfa, Luo Sihai, Nie Fusheng. THE QUASI-STATIC METHOD OF THE SEISMIC SOIL PRESSURE CALCULATION BASED ON THE STATIC EARTH PRESSURE ASSUMPTIONS IN THE CODE FOR DESIGN OF TUNNEL [J]. INDUSTRIAL CONSTRUCTION, 2013, 43(2): 83-87. doi: 10.13204/j.gyjz201302017
[14] Wu Zhanrui, Qi Taiyue, Tang Jincai. OPTIMIZATION ANALYSIS OF CONSTRUCTION METHOD FOR SHALLOW-BURIED TUNNEL WITH LARGE SECTION [J]. INDUSTRIAL CONSTRUCTION, 2012, 42(8): 102-107. doi: 10.13204/j.gyjz201208022
[15] Yu Jianying, Wei Gang. THE STATE AND THE ART OF THE IMPACT OF UNDERGROUND TUNNEL CONSTRUCTION ON ADJACENT BUILDINGS [J]. INDUSTRIAL CONSTRUCTION, 2011, 41(9): 116-119. doi: 10.13204/j.gyjz201109026
[16] Zhang Xudong, Liu Xinrong. A STUDY ON THE FEATURE AND FORMATION MECHANISM OF SUPER KARST WATER BURST IN DEEP KARST TUNNEL [J]. INDUSTRIAL CONSTRUCTION, 2011, 41(4): 79-84. doi: 10.13204/j.gyjz201104018
[17] Yu Yanxin, Nie Lei, Shen Shiwei, Ding Huangping. APPLICATION OF TUNNEL SEISMIC PREDICTION SYSTEM TO THE TUNNEL CONSTRUCTION OF YUXIANG EXPRESSWAY [J]. INDUSTRIAL CONSTRUCTION, 2010, 40(5): 100-103. doi: 10.13204/j.gyjz201005021
[18] Yao Yong, Tian Zhi-yu. STUDY ON MECHANICAL BEHAVIOR AND REINFORCING MEASURES OF MIDDLE ROCK WALL OF PARALLEL TUNNEL WITH SMALL INTERVAL [J]. INDUSTRIAL CONSTRUCTION, 2006, 36(4): 57-60,84. doi: 10.13204/j.gyjz200604017
[19] Zhao Dazhou, Wang Qingxiang, Guan Ping. RESEARCH ON LOAD-BEARING CAPACITY OF STEEL TUBULAR COLUMNS FILLED WITH STEEL-REINFORCED HIGH-STRENGTHCONCRETE SUBJECTED TO COMPRESSION AND BENDING [J]. INDUSTRIAL CONSTRUCTION, 2005, 35(9): 84-85,93. doi: 10.13204/j.gyjz200509023
[20] Chen Wanxiang, Yang Liang, Guo Zhikun, Huang Yu, Zhang Shi. STUDY ON TEMPERATURE CONTROL OF MASS CONCRETE IN XUANWU LAKE TUNNEL [J]. INDUSTRIAL CONSTRUCTION, 2004, 34(10): 53-55. doi: 10.13204/j.gyjz200410016
Proportional views
Created with Highcharts 5.0.7 Amount of access Chart context menu Abstract Views, HTML Views, PDF Downloads Statistics Abstract Views HTML Views PDF Downloads 2024-05 2024-06 2024-07 2024-08 2024-09 2024-10 2024-11 2024-12 2025-01 2025-02 2025-03 2025-04 0 1 2 3 4 5
Created with Highcharts 5.0.7 Chart context menu Access Class Distribution FULLTEXT : 5.6 % FULLTEXT : 5.6 % META : 93.1 % META : 93.1 % PDF : 1.4 % PDF : 1.4 % FULLTEXT META PDF
Created with Highcharts 5.0.7 Chart context menu Access Area Distribution 其他 : 11.1 % 其他 : 11.1 % 北京 : 5.6 % 北京 : 5.6 % 宿州 : 1.4 % 宿州 : 1.4 % 常德 : 2.8 % 常德 : 2.8 % 广州 : 1.4 % 广州 : 1.4 % 张家口 : 4.2 % 张家口 : 4.2 % 成都 : 1.4 % 成都 : 1.4 % 晋城 : 1.4 % 晋城 : 1.4 % 朝阳 : 1.4 % 朝阳 : 1.4 % 芒廷维尤 : 26.4 % 芒廷维尤 : 26.4 % 西宁 : 18.1 % 西宁 : 18.1 % 贵阳 : 1.4 % 贵阳 : 1.4 % 运城 : 18.1 % 运城 : 18.1 % 邯郸 : 1.4 % 邯郸 : 1.4 % 郑州 : 2.8 % 郑州 : 2.8 % 阳泉 : 1.4 % 阳泉 : 1.4 % 其他 北京 宿州 常德 广州 张家口 成都 晋城 朝阳 芒廷维尤 西宁 贵阳 运城 邯郸 郑州 阳泉