Shen Mingshan, Li Jinbao, Pan Liushun, Wang Ruikou. STRENGTHENING OF MAIN MILL BUILDING OF JIANGSU JINGSHEN SALT INDUSTRY COMPANY LIMITED[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(5): 105-106. doi: 10.13204/j.gyjz200505028
Citation:
Shen Mingshan, Li Jinbao, Pan Liushun, Wang Ruikou. STRENGTHENING OF MAIN MILL BUILDING OF JIANGSU JINGSHEN SALT INDUSTRY COMPANY LIMITED[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(5): 105-106. doi: 10.13204/j.gyjz200505028
Shen Mingshan, Li Jinbao, Pan Liushun, Wang Ruikou. STRENGTHENING OF MAIN MILL BUILDING OF JIANGSU JINGSHEN SALT INDUSTRY COMPANY LIMITED[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(5): 105-106. doi: 10.13204/j.gyjz200505028
Citation:
Shen Mingshan, Li Jinbao, Pan Liushun, Wang Ruikou. STRENGTHENING OF MAIN MILL BUILDING OF JIANGSU JINGSHEN SALT INDUSTRY COMPANY LIMITED[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(5): 105-106. doi: 10.13204/j.gyjz200505028
The treatment scheme of strengthening the mill building was proposed through the analysis of the damages to the concrete structure by chlorides,by which the strengthening of the mill building was completed,which provided useful experience for the design and construction of similar projects.