In the dwelling construction of a city, when meeting the ground under which there is a certain thickness of soft soil, it is a better choice to let a static bol-t pressing pile and foundation under wall work together in consideration of condition restriction of the building place and economic cost. Engineering practice shows that this method is very effect in controlling settlement of building and also an economic one.