Zheng Wenzhong, Liu Tie, Wang Ying. STRUCTURE REMODELING DESIGN OF OFFICE BUILDING FOR COMMITTEE OF FAMILY PLANNING IN HARBIN[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(4): 6-9. doi: 10.13204/j.gyjz200504002
Citation:
Zheng Wenzhong, Liu Tie, Wang Ying. STRUCTURE REMODELING DESIGN OF OFFICE BUILDING FOR COMMITTEE OF FAMILY PLANNING IN HARBIN[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(4): 6-9. doi: 10.13204/j.gyjz200504002
Zheng Wenzhong, Liu Tie, Wang Ying. STRUCTURE REMODELING DESIGN OF OFFICE BUILDING FOR COMMITTEE OF FAMILY PLANNING IN HARBIN[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(4): 6-9. doi: 10.13204/j.gyjz200504002
Citation:
Zheng Wenzhong, Liu Tie, Wang Ying. STRUCTURE REMODELING DESIGN OF OFFICE BUILDING FOR COMMITTEE OF FAMILY PLANNING IN HARBIN[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(4): 6-9. doi: 10.13204/j.gyjz200504002
Design thought and method of underpinning beam, column, foundation and relative joint construction in?remodeling office building for Committee of Family Planning in Harbin are introduced.Some problems need to be regarded in?remodeling construction are presented.It can be served as reference for structure remodeling of the similar project.