[1] | Wang Qingli, Li Ruilin, Li Qinggang, Wang Yue. STATIC PERFORMANCE OF THE HIGH-PERFORMANCE CONCRETE FILLED STEEL TUBULAR STUB COLUMN(Ⅱ): MECHANISM ANALYSIS AND LOAD BEARING CAPACITY[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(3): 8-12. doi: 10.13204/j.gyjz201303002 |
[2] | Yin Xiaodong, Li Qinggang, Wang Qingli. STATIC PERFORMANCE OF THE HIGH-PERFORMANCE CONCRETE FILLED STEEL TUBULAR BEAM-COLUMN(Ⅱ): MECHANISM ANALYSIS AND LOAD BEARING CAPACITY[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(3): 30-35,7. doi: 10.13204/j.gyjz201303006 |
[3] | Wang Qingli, Wu Jun, Li Qinggang, Wang Yue. STATIC PERFORMANCE OF THE HIGH-PERFORMANCE CONCRETE FILLED STEEL TUBULAR FLEXURAL MEMBER(Ⅱ): MECHANISM ANALYSIS AND LOAD BEARING CAPACITY[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(3): 18-23. doi: 10.13204/j.gyjz201303004 |
[4] | Wang Haiyan, Qiu Wenge, Man Shuai, Chen Xuefeng. EXPERIMENTAL RESEARCH ON HIGH-PERFORMANCE CONCRETE TUNNEL LINING BASED ON COMPOSITE CEMENTITIOUS MATERIAL[J]. INDUSTRIAL CONSTRUCTION, 2013, 43(9): 111-115. doi: 10.13204/j.gyjz201309021 |
[5] | Ye Qiong, He Yabo. C60 HIGH PERFORMANCE CONCRETE PUMPING PARAMETERS FOR A SUPERHIGH BUILDING[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(1): 144-148,97. doi: 10.13204/j.gyjz201201028 |
[6] | Wang Mingfang, Sun Yuyong. EXPERIMENTAL STUDY ON SALIFICATION EROSION RESISTANCE DURABILITY OF HIGH PERFORMANCE CONCRETE[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(6): 127-130. doi: 10.13204/j.gyjz201206027 |
[7] | Sheng Li, Yao Jian. EXPERIMENTAL STUDY ON THE PENETRATION OF CHLORIDE IONS INTO HIGH PERFORMANCE CONCRETE[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(11): 142-145,149. doi: 10.13204/j.gyjz201111031 |
[8] | Dong Xiangjun, LüChaokun. EXPERIMENTAL STUDIES ON COMPRESSIVE STRENGTH OF HPC SUBJECT TO HIGH-TEMPERATURE BASED ON MICROSTRUCTURE ANALYSIS[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(9): 90-93. doi: 10.13204/j.gyjz201109020 |
[9] | Li Lei, Zheng Shansuo, Deng Guozhuan, Wang Bin, Wang Wei. NUMERICAL SIMULATION FOR SRHPC FRAME AND PARAMETERS ANALYSIS[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(5): 124-128,132. doi: 10.13204/j.gyjz201005026 |
[10] | Zhang Yuntao, Meng Shaoping, Xi Zhuo, Pan Zuanfeng, Lin Bo. EXPERIMENTAL RESEARCH ON PRESTRESSING TIME-DEPENDENT LOSS OF HIGH-PERFORMANCE CONCRETE BEAMS[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(12): 21-25. doi: 10.13204/j.gyjz200912006 |
[11] | Cao Hui, Yang Renshu, Dong Jucai, Sun Wei. EXPERIMENTAL RESEARCH ON STRENGTH AND PORE STRUCTURE OF MINUS TEMPERATURE HPC[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(6): 105-107. doi: 10.13204/j.gyjz200906025 |
[12] | Zhang Yuntao, Xi Zhuo, Meng Shaoping, Liu Zhao. EXPERIMENTAL STUDY ON BEHAVIOR OF CANTILEVER GIRDER INDUCED BY SHRINKAGE AND CREEP OF HIGH-PERFORMANCE CONCRETE[J]. INDUSTRIAL CONSTRUCTION, 2009, 39(12): 26-28. doi: 10.13204/j.gyjz200912007 |
[13] | Ding Min, Xue Weichen, Wang Hua. EXPERIMENT ON STUD SHEAR CONNECTORS IN STEEL-HIGH PERFORMANCE CONCRETE COMPOSITE BEAMS[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(8): 9-13. doi: 10.13204/j.gyjz200708003 |
[14] | Yao Ming-fu, Zhan Bing-gen, Hui Ling. CURING OF HIGH PERFORMANCE CONCRETE[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(4): 70-72,90. doi: 10.13204/j.gyjz200604021 |
[15] | Song Shao-min, Geng Lei. THE STUDY ON IMPERMEABILITY AND FREEZING RESISTANCE OF HIGH PERFORMANCE CONCRETE WITH ARTIFICIAL SAND[J]. INDUSTRIAL CONSTRUCTION, 2006, 36(7): 68-70,99. doi: 10.13204/j.gyjz200607018 |
[16] | Yao Wu. CONTROL AND OPTIMIZED DESIGN FOR VOLUME STABILITY OF HIGH PERFORMANCE CONCRETE[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(11): 74-77. doi: 10.13204/j.gyjz200511022 |
[17] | Wang Ping, Xiao Jianzhuan, Chen Ruisheng, Zheng Xuebin. EXPERIMENTAL STUDY ON EFFECT OF POLYPROPYLENE FIBER ON MECHANICAL PROPERTY OF HIGH PERFORMANCE CONCRETE AFTER HIGH TEMPERATURE[J]. INDUSTRIAL CONSTRUCTION, 2005, 35(11): 67-69,77. doi: 10.13204/j.gyjz200511020 |
[18] | Zhao Qun, Wu Donghai, Guo Zili. STUDY ON C80 HIGH PERFORMANCE CONCRETE WITH STEEL SLAG AND SILICA FUME[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(11): 58-60,84. doi: 10.13204/j.gyjz200411015 |
[19] | Xiao Jianzhuang, Lu Fuhai, Sun Zhenping. STUDY ON CHLORIDE ION PERMEABILITY OF HIGH PERFORMANCE CONCRETE WITH DESALTED SEA SAND[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(5): 4-6,14. doi: 10.13204/j.gyjz200405002 |