Chen Wanxiang, Yang Liang, Guo Zhikun, Huang Yu, Zhang Shi. STUDY ON TEMPERATURE CONTROL OF MASS CONCRETE IN XUANWU LAKE TUNNEL[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(10): 53-55. doi: 10.13204/j.gyjz200410016
Citation:
Chen Wanxiang, Yang Liang, Guo Zhikun, Huang Yu, Zhang Shi. STUDY ON TEMPERATURE CONTROL OF MASS CONCRETE IN XUANWU LAKE TUNNEL[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(10): 53-55. doi: 10.13204/j.gyjz200410016
Chen Wanxiang, Yang Liang, Guo Zhikun, Huang Yu, Zhang Shi. STUDY ON TEMPERATURE CONTROL OF MASS CONCRETE IN XUANWU LAKE TUNNEL[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(10): 53-55. doi: 10.13204/j.gyjz200410016
Citation:
Chen Wanxiang, Yang Liang, Guo Zhikun, Huang Yu, Zhang Shi. STUDY ON TEMPERATURE CONTROL OF MASS CONCRETE IN XUANWU LAKE TUNNEL[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(10): 53-55. doi: 10.13204/j.gyjz200410016
According to the testing data of binding material hydration heat, temperature differences at every setting time and every part of the concrete walls can be estimated approximately by a certain theoretical hypothesis.It is proved that the maximal temperature differences of mass concrete in Xuanwu Lake Tunnel which caused by hydration heat were within 25℃,and they were accorded with the requirements proposed by engineering.