Citation: | Zai Jinmin, Wang Wei, Wang Xudong, Qi Kejun, Zhang Yunjun. PREDICTION OF EXCESS PORE WATER PRESSURE RESULTED FROM STATIC PRESSED PILE AND TIME-DEPENDENT PILE ULTIMATE BEARING CAPACITY[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(8): 33-35. doi: 10.13204/j.gyjz200408011 |
[2] Chow F C, Jardine R J, Nauroy J F, et al. Time-Related Increases in the Shaft Capacities of Driven Piles in Sand. Geotechnique, 1997,47(2):353~361
|
Chow F C, Jardine R J, Brucy F, et al. Effects of Time on Capacity of Pipe Piles in Dense Marine Sand. Journal of Geotechnical and Geoenvironmental Engineering, 1998,124(3):254~264
|
[3] Long J H, Kerrigan J A, Wysockey M H. Measured Time Effects for Axial Capacity of Driven Piling. Transportation Research Record. 1999:8~15
|
[4] Fleming W G K, W K Elson. Pile Engineering. 2nd Edition.New York:John Wiley Sons, 1992.118~122
|
[5] 宰金珉,宰金璋.高层建筑分析与设计.北京:中国建筑工业出版社,1993
|
[6] 叶为民,黄雨,唐益群,等.饱和软土中打入式预制桩单桩承载力的时效.岩土力学,2000,21(4):367~369
|
[7] 陈文,施建勇,龚友平,等.饱和软粘土中静压桩挤土效应的模拟实验研究.河海大学学报,1999(3):103~109
|
[8] 王伟.沉桩引起的超孔隙水压力的预测及其应用:[硕士学位论文].南京:南京工业大学,2002
|
[9] 王伟,宰金珉,王旭东.沉桩引起的三维超静孔隙水压力计算及其应用.岩土力学,2004,25(5):774~777
|
[10] 唐世栋.用有效应力原理分析桩基承载力的变化全过程:[博士学位论文].上海:同济大学,1990
|
[11] 王伟,宰金珉,王旭东.考虑时间效应的预制桩单桩承载力解析解.南京工业大学学报,2003,25(5):13~16
|