Citation: | Wang Wenda, Han Linhai. ANALYSIS OF MECHANICAL BEHAVIOUR OF CONCRETE FILLED STEEL TUBULAR STRUCTURES DURING CONSTRUCTION[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(6): 65-67,58. doi: 10.13204/j.gyjz200406021 |
韩林海.钢管混凝土结构--理论与实践.北京:科学出版社,2004
|
[2] 钟善桐.钢管混凝土结构.第三版.北京:清华大学出版社,2003
|
[3] 秦荣,谢肖礼,等.钢管混凝土拱桥钢管开裂事故分析.土木工程学报,2001,34(3):74~77
|
[4] Uy B,Bradford M A.Wet Concrete Loading of Profiled Trough Girders.Thin-Walled Structures,1996,25(2):81~108
|
[5] Uy B,Das S.Wet Concrete Loading of Thin-Walled Steel Box Columns During the Construction of a Tall Building.Journal of Constructional Steel Research,1998,42(2):95~119
|
[6] Wright H D,Gallocher S C.The Behavior of Composite Walling Under Construction and Service Loading.Journal of Constructional Steel Research,1995,35:257~273
|
[7] 韩林海,尧国皇.钢管初应力对钢管混凝土压弯构件力学性能的影响.土木工程学报,2003,36(4):8~18
|
[8] Han Linhai,Yao Guohuang.Behaviour of Concrete-Filled Hollow Structural Steel (HSS) Columns with Pre-load on the Steel Tubes.Journal of Constructional Steel Research,2003,59(12):1 455~1 475
|
[9] 陈之毅,秦效启,沈祖炎,等.湿混凝土浇筑过程中方钢管混凝土柱侧壁压力的试验研究.建筑结构,2003,33(7):27~28
|
[10] 朱伯芳.有限单元法原理与应用.第三版.北京:中国水利水电出版社,1998
|
[11] 曹志远.土木工程分析的施工力学与时变力学基础.土木工程学报,2001,34(3):41~46
|