Duan Hai, Wang Xiaoyang, Zhang Xibo. APPLICATION OF“DELAY CONNECTION”TECHNOLOGY OF OUTRIGGER TRUSS FOR SUPER TALL BUILDINGS IN MAIN TOWER OF SHENYANG HENGLONG PLAZA PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(11): 141-144. doi: 10.13204/j.gyjz2001411028
Citation: Duan Hai, Wang Xiaoyang, Zhang Xibo. APPLICATION OF“DELAY CONNECTION”TECHNOLOGY OF OUTRIGGER TRUSS FOR SUPER TALL BUILDINGS IN MAIN TOWER OF SHENYANG HENGLONG PLAZA PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(11): 141-144. doi: 10.13204/j.gyjz2001411028

APPLICATION OF“DELAY CONNECTION”TECHNOLOGY OF OUTRIGGER TRUSS FOR SUPER TALL BUILDINGS IN MAIN TOWER OF SHENYANG HENGLONG PLAZA PROJECT

doi: 10.13204/j.gyjz2001411028
  • Publish Date: 2014-11-15
  • As the horizontal load is the dominant factor for a super tall building,setting outrigger can improve the overall performance of the structure,so as to improve the lateral stiffness of the structure,control the displacement on top of the structure,and reduce overturning moment that core tube bears. However,when the outrigger trusses are in construction stage,the rate of progress of construction between the frame and core tube is not synchronous and structure arrangement is unequal etc,which will lead to uneven deformation between the frame and core tube. If the outrigger trusses are blindly installed,a greater internal stress will be generated in outrigger truss,which may cause the bearing condition of the whole structure can not match the original structure design model after the structure is finished. It was proposed a“delay connection”construction technology of outrigger truss for super tall buildings,and the use of this method in the construction of the main tower of Shenyang Henglong Plaza showed that it could effectively solve the problem of more stress generated in outrigger truss that caused by the uneven deformation between the frame and core tube; and also ensured the smooth installation of outrigger truss and the structural performance in the using stage.
  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (152) PDF downloads(146) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return