Mao Jinping, Zheng Changjiang, Zhou Gangxiang. A PRELIMINARY STUDY OF DESIGN SYSTEM RECONSTRUCTION OF DEEP EXCAVATION ENGINEERING[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(11): 119-122. doi: 10.13204/j.gyjz2001411023
Citation:
Mao Jinping, Zheng Changjiang, Zhou Gangxiang. A PRELIMINARY STUDY OF DESIGN SYSTEM RECONSTRUCTION OF DEEP EXCAVATION ENGINEERING[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(11): 119-122. doi: 10.13204/j.gyjz2001411023
Mao Jinping, Zheng Changjiang, Zhou Gangxiang. A PRELIMINARY STUDY OF DESIGN SYSTEM RECONSTRUCTION OF DEEP EXCAVATION ENGINEERING[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(11): 119-122. doi: 10.13204/j.gyjz2001411023
Citation:
Mao Jinping, Zheng Changjiang, Zhou Gangxiang. A PRELIMINARY STUDY OF DESIGN SYSTEM RECONSTRUCTION OF DEEP EXCAVATION ENGINEERING[J]. INDUSTRIAL CONSTRUCTION, 2014, 44(11): 119-122. doi: 10.13204/j.gyjz2001411023
Based on resource sharing and a resource-efficient society built,the design process of deep excavation
support system was to be re-examined. The necessity and the ways of design system reconstruction of deep excavation
support system were proposed,especially risk analysis and assessment module,economy assessment module,scheme
optimization module,construction drawing module and the case module. Finally,some discussions were made.