[1] | CHI Heng. Seismic Dynamic Analysis of Free Fields and Comparisons of Influence Factors in Underground Engineering[J]. INDUSTRIAL CONSTRUCTION, 2022, 52(9): 214-218,160. doi: 10.13204/j.gyjzg21062506 |
[2] | Zhou Luping, Hang Yongshan. APPLICATION AND ANALYSIS OF INDUCING JOINT IN CHANGZHOU UNDERGROUND PROJECT[J]. INDUSTRIAL CONSTRUCTION, 2011, 41(11): 100-103. doi: 10.13204/j.gyjz201111022 |
[3] | Li Jianwei. OVERALL WATERPROOFING TREATMENT OF UNDERGROUND PROJECT FOR BEIJING TELEVISION CENTER[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(2): 110-111,83. doi: 10.13204/j.gyjz200702028 |
[4] | Guo Yanlin, Cui Xiaoqiang. KEY TECHNICAL PROBLEMS AND DISCUSSION IN CONSTRUCTION PROCESS OF LARGE SPAN STEEL STRUCTURES[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(12): 1-5,22. doi: 10.13204/j.gyjz200412001 |
[5] | Bao Yan, Ye Weidong, Zhang Baoliang, Zhao Xihong. A STUDY ON UNDERGROUND ENGINEERING AT HENGLONG PLAZA IN SHANGHAI[J]. INDUSTRIAL CONSTRUCTION, 2004, 34(12): 91-95. doi: 10.13204/j.gyjz200412028 |