[2] | Yuan Jianbin, Fang Yingguang. MONITORING OF THE OPEN-CUT SECTION OF A CABLE TUNNEL IN GUANGZHOU[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(2): 111-114. doi: 10.13204/j.gyjz201202025 |
[3] | Yang Min, Gao Gonglue. TEST OF FOUNDATION REINFORCEMENT OF OPERATIONAL SUBSTATION BY DEVELOPING SMALL-SCALE PILE DRIVER[J]. INDUSTRIAL CONSTRUCTION, 2010, 40(7): 118-122. doi: 10.13204/j.gyjz201007029 |
[4] | Liu Hong-hong, Liao Li-jun. PLANNING AND DESIGN OF GUANGZHOU LIKENG POWER PLANT BY INCINERATING REFUSES[J]. INDUSTRIAL CONSTRUCTION, 2007, 37(11): 16-19,31. doi: 10.13204/j.gyjz200711005 |