[1] | Dai Yan Zhou Tianhua, . APPLICATION OF SYNCHRONOUS JACK-UP SYSTEM IN CORRECTION AND BEARING-REPLACEMENT OF CURVED BEAM[J]. INDUSTRIAL CONSTRUCTION, 2015, 45(6): 175-178. doi: 10.13204/j.gyjz201506034 |
[3] | Wu Quanke, Wu Tiansheng, Lin Chao. CONSTRUCTION TECHNOLOGY RESEARCH ON RECTIFYING DEVIATION AND DOWN RESISTANCE REDUCTION OF MUD BALANCED PIPE- JACKING WITH LARGE- DIAMETER AND LONG- DISTANCE IN SOFT SOIL[J]. INDUSTRIAL CONSTRUCTION, 2012, 42(4): 107-112. doi: 10.13204/j.gyjz201204023 |