Safety Limit Analysis for the Whole Construction Process of a Super High-Rise Building Under Strong Earthquakes
-
摘要: 超高层建筑施工期长,在结构整体刚度未完备时的整个施工过程中,结构在各种施工荷载和环境风、地震作用下的安全是施工期值得关注的关键问题之一。为了研究上述问题,采用数值模拟的方法,在结构整体刚度未完备时的不同阶段,分析了强震作用对施工过程的影响。以银川绿地中心超高层项目南塔楼工程为例,该结构体由伸臂桁架连接钢框架-钢筋混凝土核心筒组成,采用了ANSYS中生死单元的功能来模拟不同施工阶段,通过强震作用下的计算分析,将所得最大应力与材料容许应力对比、最大层间位移与相关规范要求的位移限值对比,评估结构的安全性。研究结果表明:不同模型下最大应力、层间位移及层间位移角均小于GB 50011—2010《建筑抗震设计规范》中的限值,结构在施工期内符合可靠性要求。通过对比,伸臂桁架在连接内外筒之后,对结构整体抗侧刚度有显著提高作用,最大Y向位移减少了12.1%,外框筒和核心筒最大Mises应力分别减少了33.3%和25.2%。Abstract: The construction period of super high-rise building is long. In the whole construction process when the overall stiffness of the structure has not been formed, the safety of the structure under various construction loads, environmental wind and earthquake in the construction period was one of the key problems worthy of attention. In order to study the above problems, the numerical simulation method was adopted in this paper. The influence of strong earthquake on structural safety during construction was analyzed at different stages when the overall stiffness of the structure is incomplete. The South Tower of the Yinchuan Greenland Center super high-rise project was taken as an example. The structure consists of an outrigger truss connected steel frame-reinforced and concrete core tube. The birth and death technology of the element in ANSYS was used to simulate the whole process of the construction of the South Tower. Through calculation and analysis, the obtained maximum stress was compared with the allowable stress of the material, the maximum displacement was compared with the displacement limit required by the specification, and the safety of the structure was evaluated. The results showed that the maximum stress, inter-story displacement and inter-story drift ratio were smaller than the limits in the specification, and the structure could meet the reliability requirements during construction. It was found that the outrigger truss could significantly improve the lateral stiffness of the structure before and after connecting the inner and outer tubes, the maximum Y-direction displacement was reduced by 12.1%, and the maximum Mises stress of the outer frame tube and the core tube was reduced by 33.3% and 25.2% respectively.
-
Key words:
- super high-rise /
- construction process /
- strong earthquake action /
- outrigger truss
-
[1] 石立国,陈宇翔,张茅.多发地震区超高层施工现场危险源评价与防控[J].施工技术,2018,47(增刊):972-976. [2] 李增玉,张茅,潘文,等.超高层结构施工期起重设备抗震分析方法探究[J].建筑技术,2018,49(10):49-52. [3] 叶智武,罗永峰,陈晓明,等.施工模拟中分步建模法的改进实现方法及应用[J].同济大学学报(自然科学版),2016,44(1):73-80. [4] 赵延彤,SWANSON J,施伟顺,等.银川绿地中心超高层结构设计[J].建筑结构,2016(增刊1):18-22. [5] 康帅,楼梦麟,殷琳.不同地震波输入机制下的结构振动台模型试验[J].同济大学学报(自然科学版),2011,39(9):1273-1279. [6] 冯晓九,许桦楠,丁琪,等.基于随机地震动模型的盾构隧道非一致地震反应分析[J].工业建筑,2017,47(7):117-121. [7] 朱瑞广,吕大刚.基于Copula函数的主余震地震动强度参数相关性分析[J].工程力学,2019,36(2):114-123. [8] 孙旭光,吴怿哲,姚贤波,等.120 m跨柱面网壳滑移法施工全过程分析[J].施工技术,2010(增刊2):378-381. [9] 李创第,丁晓华,陈俊忠,等.基础隔震结构基于Clough-Penzien谱随机地震响应分析的复模态法[J].振动与冲击,2006,25(5):162-165. [10] 张美玲,李山有,卢建旗,等.中国大陆地区地震动时程强度包络函数研究[J].地震工程与工程振动,2015,1(4):60-70. [11] 宁海勐,路国运.长周期地震动对超高层结构抗震性能的影响[J].工程抗震与加固改造,2018,40(5):68-77. [12] 李雪,余红霞,刘鹏.建筑抗震韧性的概念和评价方法及工程应用[J].建筑结构,2018(18):1-7. [13] 中华人民共和国住房和城乡建设部.建筑抗震设计规范:GB 50011-2010[S].北京:中国建筑工业出版社,2016. [14] 刘军阳,陈萌,曹植,等.超高层劲性结构伸臂桁架施工技术[J].施工技术,2016(增刊2):466-468.
点击查看大图
计量
- 文章访问数: 71
- HTML全文浏览量: 9
- PDF下载量: 2
- 被引次数: 0