THE INFLUNENCE OF DEEP CLEARANCE ON THE SETTLEMENT OF ADJACENT STRUCTURES
-
摘要: 在旧城区改造建设过程中,时常针对影响拟建工程的天然或人工构筑物进行清障工作。在清障过程中对关键构筑物实施保护越来越成为建筑工程师们关注的焦点。为此,结合上海软土地层中采用全回转套筒钻机进行拔桩工程实例,通过实测数据分析拔桩的施工工序及对邻近构筑物的沉降影响。分析结果表明:为控制邻近构筑物沉降变形,需要合理安排清障的施工顺序并及时对施工过程中发生的事故进行工程应急处理。Abstract: In the reconstruction tall-rotating process of the old urban area, it is often necessary to clear the natural or artificial structures that affect the proposed project. How to protect key structures in the process of obstacle clearance has become the focus of attention of structural engineers. Based on the cases of pile pulling construction in soft soil layer of Shanghai with tall-skave drill, the paper discussed the influence of the construction process and accidents on the settlement of the adjacent structures by analyzing the measured data. The analysis results showed that it was necessary to arrange the pile pulling construction process reasonably and deal with the accidents occurred in time in order to control the settlement of adjacent structures.
-
Key words:
- pile pulling construction /
- common ditch /
- settlement /
- monitoring
-
杨石飞,顾国荣,王福林.深层清障技术纵论[J].地下空间与工程学报,2008, 4(2):387-391. 冷金荣,周涛,曹东.360°全回转套管机在拔桩工程中的应用[J].山西建筑,2014(28):47-49. 张中杰,汤翔,王福林.FCEC全回转拔桩技术在越江隧道地下清障中的应用[J].地震工程学报,2015,37(增刊2):75-78. 韩泽亮. 钻孔灌注桩拔除工艺研究[J].岩土工程学报, 2010,(增刊2):410-413. 宋辉,常莹,黄超,等. 套管法拔桩对既有大直径地下污水管的影响[J].上海大学学报(自然科学版),2011, 17(3):320-324. 曹兆虎,孔纲强,周航,等.基于透明土材料的异形桩拔桩过程对比模型试验[J].铁道科学与工程学报,2014, 11(3):71-76.
点击查看大图
计量
- 文章访问数: 66
- HTML全文浏览量: 12
- PDF下载量: 3
- 被引次数: 0