DISCUSSIONS ON THE ISSUES FOR THE FRAME JOINT DESIGN OF COMPOSITE STRUCTURE OF METRO DEPOT PROJECT
-
摘要: 首先简述了车辆段项目组合结构的应用概况。随后对车辆段组合结构框架的基础节点、梁柱连接节点、上下柱连接节点、梁托柱连接节点、预留钢柱头节点逐一进行了分类介绍与阐述,重点对JGJ 138—2016《组合结构设计规范》、型钢混凝土及钢管混凝土图集所示范例不能涵盖的几种典型实际情况进行了详解。最后,根据工程经验推介了相应的改进方案和措施,并阐述了所述方案和措施的技术合理性与施工可行性,为今后地铁车辆段组合结构的框架节点设计提供一定的借鉴和启发。Abstract: The application of composite structure in metro depot was briefly described firstly. Then the base joint, beam-column joint, joint of upper column and lower column, joint of beam-supported column, steel chapiter reserved joint of the composite frame structure,were classified and introduced one by one. Several typical complicated situations in practical design were explained in detail, which were not covered by present codes or atlases of steel reinforced concrete (SRC) and concrete filled steel tube. Finally, based on experience, some improvements and measures to solve these problems were recommended, and their technical rationality and constructive feasibility were also expounded, which could provide some references and inspirations for the design of composite frame joints of metro depot in the future.
-
中华人民共和国住房和城乡建设部.组合结构设计规范:JGJ 138-2016[S].北京:中国建筑工业出版社, 2016. 郑青松.浅析城市轨道交通车辆段上盖物业开发[J].城市建设理论研究(电子版),2012(19):18-20. 中华人民共和国建设部.型钢混凝土组合结构构造:04SG523[S].北京:中国计划出版社, 2004. 中华人民共和国住房和城乡建设部.型钢混凝土结构施工钢筋排布规则与构造详图:12SG904-1[S].北京:中国计划出版社, 2017. 中华人民共和国建设部.钢管混凝土结构构造:06SG524[S].北京:中国计划出版社, 2006. 吴海朋.型钢混凝土组合结构节点设计浅谈[J].建材发展导向(上),2017, 15(17):153-154. 马新英.型钢混凝土框架节点设计探讨[J].山西建筑,2013,39(14):29-31. 佟京阳.钢管混凝土节点设计[J].山西建筑,2008,34(16):65-69. 中华人民共和国住房和城乡建设部.钢管混凝土结构技术规范:GB 50936-2014[S].北京:中国建筑工业出版社, 2014. 王伟锋.型钢混凝土组合结构节点设计[J].施工技术,2012,41(4):47-49.
点击查看大图
计量
- 文章访问数: 81
- HTML全文浏览量: 8
- PDF下载量: 5
- 被引次数: 0