阳江核电4号机组安全壳截锥体自密实混凝土施工方法
doi: 10.13204/j.gyjz201510026
SELF-COMPACTING CONCRETE CONSTRUCTION METHOD FOR CONTAINMENT TRUNCATED CONE IN NO. 4 UNIT OF YANGJIANG NUCLEAR POWER PLANT
-
摘要: 阳江核电厂采用改进型压水堆CPR1000堆型,为确保安全壳截锥体超大环形预应力混凝土浇筑质量,经一系列配比试验和现场模拟试验研究,4号机组成功应用了自密实混凝土施工技术,并取得良好效果。作为核电行业同类结构应用自密实混凝土的首例,阳江核电4号机组安全壳截锥体自密实混凝土施工方法可为相关工程提供借鉴。Abstract: Upgraded pressurized water reactor of CPR1000 was adopted in Yangjiang Nuclear Power Plant ( NPP) . Based on a series of mixing tests and site mockup test studies,self-compacting concrete ( SCC) technique was successfully applied to containment truncated cone of No. 4 unit for the first time in NPP building industry,which could provide references for relevant projects with similar prestressed concrete structures.
-
Key words:
- containment /
- truncated cone /
- self-compacting concrete /
- steel liner /
- prestressed concrete structure
点击查看大图
计量
- 文章访问数: 178
- HTML全文浏览量: 27
- PDF下载量: 114
- 被引次数: 0