新型快支早拆水平模架体系试验研究
doi: 10.13204/j.gyjz201506023
EXPERIMENTAL STUDY OF THE NEW-TYPE HORIZONTAL FORMWORK OF FAST INSTALLATION AND EARLY DISMANTLING
-
摘要: 采用足尺试验对新型快支早拆水平模架体系进行承载力分析,试验着重测试施工荷载对体系的性能影响及早拆后该体系力学性能和工程实用性。对试验模型设置6个应力测点和8个位移测点,测量连续载荷下,架体整体变形及承载力分布情况,得到架体在18.5 k N载荷下处于安全的结论。另外,新浇筑混凝土强度达到38%强度设计时,对试验中对架体实现早拆,保留立杆独立支撑,试验结果显示,结构处于安全。Abstract: Full size experiments were used to analyses the bearing capacity of a new-type horizontal formwork of fast installation and early dismantling,the tests focused on testing the performance influence of construction loads on the system and the mechanical properties of the system and engineering practicality after early demolition. It was concluded that the frame body was safe under 18. 5 kN load by setting six strain-points and eight displacement-points to measure on the experimental model under continuous load and also measuring the overall deformation and bearing capacity of the frame body. In addition,when the new pouring concrete strength reaches 38%,the frame body was removed first the early and retaining pole support retained independently. The experiment results showed that the structure was in a safe state. The experiment results provide strong support for the promotion and application of the frameworks,and the experiment methods also provide some reference for the experiments of relevant scaffold.
-
Key words:
- scaffold /
- test study /
- full size test /
- early removal /
- mechanical performance
点击查看大图
计量
- 文章访问数: 130
- HTML全文浏览量: 5
- PDF下载量: 140
- 被引次数: 0