某超深矿山竖井修复及加固方案的论证分析
doi: 10.13204/j.gyjz201403034
ANALYSIS AND RESEARCH ON REPAIR AND REINFORCEMENT OF ULTRA-DEEP MINE VERTICAL SHAFT
-
摘要: 某水泥厂矿山竖井发生严重垮塌导致无法使用。通过综合分析对比,并基于二维有限元数值模拟,确定了钢模板+钢筋混凝土衬砌(内模法)+锚杆(土钉封堵法)+锰钢护筒(护筒跟进法)的修复及加固方案。该方案的成功实施验证了其可行性,可作为矿山竖井修复、加固工程中的成功案例。Abstract: There is a serious collapse in a mine vertical shaft of a cement factory which can not be used. After synthesis analysis and numerical simulation of 2D finite element,the repair and reinforcement scheme,that the template + steel reinforced concrete lining (internal model method) + bolt (soil nailing block method) + Mn steel casing ( casing follow-up method) is confirmed. The plan have already been carried out,and its feasibility is verified. It is a successful case of mine vertical shaft repair and reinforcement.
-
Key words:
- vertical shaft /
- reinforcement /
- lining /
- numerical simulation