片式冠梁双排桩支护结构的变形受力特性研究
doi: 10.13204/j.gyjz201403021
RESEARCH ON PROPERTIES OF DEFORMATION AND MECHANICS ON DOUBLE-ROW PILE STRUCTURE WITH FLAKE TOP BEAM
-
摘要: 采用MIDAS-GTS软件,建立起同时考虑土层、实体支护结构、桩土界面Goodman单元以及实际施工过程的片式冠梁双排桩支护基坑三维有限元分析模型。分析表明:片式冠梁在基坑规模不大时对支护桩水平位移具有较强的约束作用,且冠梁的最大弯矩及剪力位于坑角附近。在其他参数不变、仅冠梁长度改变的情况下,冠梁的水平位移曲线、冠梁剪力曲线可视为自变量是坑角水平距离值的一元函数,与冠梁本身的长度关系不大。当冠梁高度增大时,冠梁的弯矩及剪力值均明显增加,但冠梁水平位移减少并不明显。而冠梁参数不变时,随着基坑开挖深度的增加,基坑长侧中部处冠梁的水平位移、弯矩及剪力有加速增大至失稳破坏的趋势。随着排距的增大,长边冠梁的水平位移、弯矩及剪力的最大值会逐渐减少,但减少的速率也在降低。桩距的增大对长边冠梁的位移及受力情况影响较小。
-
关键词:
- 片式冠梁 /
- 双排桩 /
- Goodman 单元 /
- MIDAS-GTS
Abstract: The 3D FEM software MIDAS-GTS was used for establishing numerical analysis model of double-row pile structure with flake top beam,in which practical soil layers,solid supporting structures,Goodman contact elements and actual construction stages were simulatneously considered. The resulted of the study showed that the horizontal displacement of supporting pile was strongly limited by flake top beam when the size of deep excavation was not large enough. The maximum values of bending moment and shearing force of top beam always appeared near the corner of the excavation. Along with change of the length of top beam,while other parameters were fixed,the curves of horizontal displacement and shear force of top beam were just single variable function with only one argument (horizontal displacement from the corner of the excavation),which little related with the length of top beam. When the hight of top beam was raised,the bending moment and shearing force of top beam were highly increased but the decrease of horizontal displacement of top beam was not sharp. Along with increasing of the depth of the excavation, the value of bending moment and internal force in the middle of top beam rose obviously. While the distance between the front and back pile increased,the value of bending moment and internal force in the middle of top beam decreased,yet,the rate of reduction also decreased. The increment of the distance between the front and back pile impacted the bending moment and internal force of top beam slightly.-
Key words:
- flake top beam /
- double-row pile /
- Goodman element /
- MIDAS-GTS
期刊类型引用(4)
1. 王坤,王玉祥,陶思源,刘苏,马露,朱学敏. 托底抗拔桩侧摩阻力发挥机理及计算模型研究. 科技创新与应用. 2024(04): 24-27 . 百度学术
2. 刘晓丹,陶思源,刘苏,王玉祥,朱学敏,马露. 基于数值模拟的抗拔桩力学性能研究. 新技术新工艺. 2024(03): 52-55 . 百度学术
3. 白晓宇,秘金卫,王雪岭,张广亮,乔永胜,许绍帅,张明义. 抗拔桩在抗浮工程中的研究进展. 科学技术与工程. 2022(17): 6781-6789 . 百度学术
4. 刘华清,安增军,刘佳龙,李媛媛,蔡建国. 加筋填芯预应力高强混凝土管桩-承台节点拉弯受力性能分析. 工业建筑. 2022(06): 12-18 . 本站查看
其他类型引用(4)
-

计量
- 文章访问数: 113
- HTML全文浏览量: 9
- PDF下载量: 106
- 被引次数: 8