FOUNDATION DESIGN OF A SUPER HIGH-RISE BUILDING WITH ENLARGED BASE
-
摘要: 某超高层建筑高243m,主体结构采用了框架-核心筒结构体系,基础选用桩筏基础形式。该工程主楼、裙房、纯地下室地下连为一体,形成大底盘主、裙地下连体建筑基础。为有效控制差异沉降,采用了变刚度调平设计、灌注桩后注浆和设置后浇带等有效措施。在简要介绍该工程结构特点的基础上,系统地阐述该工程基于结构布置、地质情况等因素综合考虑进行的基础设计,重点介绍变刚度调平设计的方法。Abstract: A super high-rise building was located in Jiangyin with a height of 243 m.It was adopted the frame-corewall structural system and pile raft foundation.The main building,podium and pure basement were connected together underground without any deformation joint,which leaded to an enlarged base.Therefore,optimized design of pile foundation stiffness,post grouting for cast-in-situ pile and post-pouring belt were used in the project for controlling differential settlement.The structure characteristics were briefly introduced,where the foundation design based on the structural arrangement and geological data were elaborated.An optimized design of pile foundation stiffness to reduce differential settlement was emphatically introduced.
-
[2] GB 500112001建筑抗震设计规范[S]. JGJ 32010高层建筑混凝土结构技术规程[S]. [3] GB 500092001建筑结构荷载规范[S]. [4] JGJ 942008建筑桩基技术规范[S]. [5] GB 500072002建筑地基基础设计规范[S]. [6] 刘金砺,高文生,邱明兵.建筑桩基技术规范应用手册[M].北京:中国建筑工业出版社,2010. [7] 朱炳寅,娄宇,杨琦.建筑地基基础设计方法及实例分析[M].北京:中国建筑工业出版社,2007:367-369. [8] DB 32/ T 2911999桩承载力自平衡测试技术规程[S]. [9] 王涛.带裙房高层建筑桩基优化设计与桩土相互作用影响系数的实验研究[D].北京:中国建筑科学研究院,2007:6-16. [10] 中国建筑科学研究院.独基、条基、钢筋混凝土地基梁、桩基础与筏板基础设计软件 JCCAD[R].北京:中国建筑科学研究院,2010.
点击查看大图
计量
- 文章访问数: 129
- HTML全文浏览量: 5
- PDF下载量: 77
- 被引次数: 0