RESEARCH ON THE APPLICATION OF PARALLEL COMPOSITE ISOLATION TECHNOLOGY IN INTEGRAL MIGRATION OF CULTURAL RELIC BUILDING
-
摘要: 将摩擦滑移隔震支座作为滑动装置进行建筑整体平移,结构就位后再连接橡胶隔震支座组成并联复合隔震结构体系。这种施工方法平移启动力较小,启动时对结构产生的振动小,提高了平移施工速度,降低了施工难度并通过改变结构的动力特性改善了建筑的抗震性能。通过某文物建筑平移实例研究这种方法的施工工艺,为工程应用提供依据。通过对就位连接后的建筑进行有限元分析,分析结果表明:复合隔震技术对降低结构地震反应有显著作用。Abstract: As the slipping device in integral migration of a building,the friction-sliding isolation bearings together with the rubber isolation bearings which is used after the structure taking its place compose the parallel composite isolation system.By applying this method,it will save effort,have a lower vibration to the structure,increase the working efficiency,reduce the construction difficulty,and improve the seismic capacity by changing dynamic characteristics.In this paper,the construction technology of the method was researched in a integral migration project of cultural relics,which provided a reference for project design and application.It was proved that the technique of parallel composite isolation analysed by the general finite element software could reduce structural seismic response significantly.
-
[2] 郑鑫,范夕森,胡春华,等.某保护性建筑隔震加固技术研究[J].工程抗震与加固改造,2009,31(5):64-69. 张鑫,张青,叶列平.建筑物整体平移与隔振技术研究[J].工程抗震与加固改造,2007,29(5):17-19. [3] 杨树标,李振宁.几种隔震体系的地震反应分析[J].特种结构,2001,18(1):36-38. [4] 杨树标,马裕超,李旭光,等.复合隔震结构模型的振动台试验研究[J].地震工程与工程震动,2010(2):76-81. [5] 尹天军,朱启华,郑华奇.北京英国使馆旧址整体平移工程设计与实施[J].建筑技术,2005,36(6):412-415. [6] JT/T6632006板式支座规格系列[S]. [7] 赵士永,边智慧,强万明.怀安县供销社住宅楼整体平移施工技术[J].粉煤灰综合利用,2008(增):28-30. [8] 吴二军,李爱群.建筑物水平旋转迁移技术及其工程应用[J].建筑技术,2008,39(9):714-717. [9] 令赟刚,赵建昌,鞠学廷,等.隔震加固多层建筑结构的非线性时程分析[J].水利与建筑工程学报,2009,7(3):146-147. [10] 夏风敏,贾留东,张鑫.一种新型动力施加方式在建筑物平移工程中的应用[J].工业建筑,2006,36(4):91-92.
点击查看大图
计量
- 文章访问数: 151
- HTML全文浏览量: 9
- PDF下载量: 77
- 被引次数: 0