INFORMATION INTEGRATION AND COLLABORATIVE COMPUTATION FOR COMPLEX STRUCTURAL MODEL
-
摘要: 通用有限元软件在处理复杂结构分析模型中,往往工程概念针对性不强且建模效率较低。根据BIM技术原理及其信息集成的内涵,以及复杂结构数据信息集成的特征,构建基于BIM技术的复杂结构信息模型基本框架,并对复杂结构模型的信息集成过程进行分析。基于BIM协同计算理念和IFC标准数据模型表达格式,设计复杂结构有限元分析模型通用转换平台,以专用于多高层建筑结构的有限元分析软件SATWE和通用有限元分析软件ABAQUS为代表,结合SATWE对复杂结构模型建模简便且符合工程概念的特点,初步开发SATWE和ABAQUS之间结构分析模型转换程序。通过上海某国际设计中心和浦东某酒店扩建工程实例应用,对转换模型4个振型的周期进行计算,并将计算结果与试验数据进行对比。结果表明,基于BIM技术的SATWE和ABAQUS模型转换程序可以提高ABAQUS针对复杂结构的建模效率,在结构协同计算中具有实用性和有效性。Abstract: When dealing with the complex structural model, the commercial finite element software is usually considered inefficient and can not be able to represent the engineering concepts well.According to BIM technology and its principles of information integration,as well as the data features of the complex structural model,a basic framework of the complex structural information model and its information integration process was built and analyzed respectively.Based on the collaborative computation concept of BIM technology and the representation format of IFC data model,a universal conversion platform was designed for the complex structural analysis model.Considering the features such as easy modeling and incorporating engineering concepts,the SATWE (a professional finite element analysis software focusing on tall-building with complex structural system) was selected to compare with ABAQUS (a commercial finite element analysis software) ,and a conversion program for structural analysis model between SATWE and ABAQUS was developed.Two projects in Shanghai including an international design center and a hotel expansion were used for the case study.The periods of four mode shapes of the conversion analysis model from SATWE to ABAQUS were calculated and compared with the test data,which show that the conversion program based on BIM technology can improve the modeling efficiency of complex structures of ABAQUS,and have the practicability and validity on the collaborative computation of the complex structures.
-
JGJ 32002 高层建筑混凝土结构技术规程[S] [2] 吕西林.超限高层建筑工程抗震设计指南[M].2 版.上海: 同济大学出版社,2009: 5-15. [3] Jordani D.BIM: a Healthy Disruption to a Fragmented and BrokenProcess [J].Journal of Building Information Modeling,2008,2(1): 24-26. [4] Smith Deke.An Introduction to Building Information Modeling(BIM) [J].Journal of Building Information Modeling (JBIM) ,2007,1(1): 12-14. [5] 邓雪原,张之勇,刘西拉.基于IFC 标准的建筑结构模型的自动生成[J].土木工程学报,2007,40(2): 6-12. [6] Liu Zhaoqiu,Li Yungui,Zhang Hanyi.IFC-Based IntegrationTool for Supporting Information Exchange from Architectural Modelto Structural Model [J].Journal of Central South University ofTechnology,2010,17(6): 1344-1350. [7] Hu Zhenzhong,Zhang Jianping,Deng Ziyin.Construction ProcessSimulation and Safety Analysis Based on Building InformationModel and 4D Technology [ J ].Tsinghua Science andTechnology,2008,13 (S1): 266-272. [8] 张建平,胡振中.基于4D 技术的施工期建筑结构安全分析研究[J].工程力学,2008,25(增刊Ⅱ): 204-212. [9] Bilal Sccar.Building Information Modeling Framework: aResearch and Delivery Foundation for Industry Stakeholders [J].Automation in Construction,2009,18 (3): 357-375. [10] 刘照球,李云贵,吕西林,等.基于BIM 建筑结构设计模型集成框架应用开发[J].同济大学学报: 自然科学版,2010,38 (7 ):948-953. [11] Building SMART[EB /OL].http: / /www.buildingsmart.com /.2011-01-10. [12] Thomas Liebich.IFC Overview: Status of Standardization,Implementation,and Use of Model-Based Work Together with IFC[J].AEC 3Ltd.,2002(5): 1-16. [13] 周玉石.结构设计的虚拟原型技术与应用研究[D].上海: 同济大学,2007.
点击查看大图
计量
- 文章访问数: 70
- HTML全文浏览量: 4
- PDF下载量: 141
- 被引次数: 0