摘要: 苏州信托大厦与天翔国际大厦两紧邻基坑,最小净距约0.38 m,周边环境复杂,开挖深度深,存在工况差异。依据地质条件与工程工期安排,采用统一协调变形的钻孔灌注桩结合内支撑体系,通过理正软件对不同剖面、启明星对支撑体系不同工况下进行了理论计算分析。分析结果表明,基坑安全可靠。整个施工过程和监测结果表明,两紧邻基坑工程围护方案是可行的。Abstract: The nearest net distance between the Trust Edifice and Tianxiang Building is 0. 38 meters in complex environment,the excavation was deep and there were different excavation conditions.The bored cast-in-place pile with prestressed interior support were used according to the geological conditions and engineering period.The theoretical calculation of foundation design was carried out with Lizheng and FRWS software on the different profile and condition.The results proved that the excavation was safe.Through the whole construction and monitoring result, it was shown that the design was reasonable.
-
Key words:
- excavation design /
- condition design /
- bracing system /
- monitoring
-
[2] 刘国彬,王卫东.基坑工程手册[M].2 版.北京: 中国建筑工业出版社,2009. 甄精莲,段仲源,贾瑞晨.深基坑支护技术综述[J].工业建筑,2006,36(增刊): 691-694. [3] 王磊,周建,贾敏才,等.相邻深基坑开挖对地下管线影响因素的分析[J].工业建筑,2008,38(10): 65-70. [4] 吴国荣.相邻基坑开挖对基坑变形影响的研究[D].广州: 广东工业大学,2010. [5] 陈东杰.上海铁路南站相邻基坑开挖变形影响研究[J].建筑科学,2005,21(6): 59-63. [6] 吴洁妹,邱式中.软土地基相邻深基坑两合一支护的工程实践[J].建筑施工,1999,21(2): 15-18. [7] 张睿华.深大基坑内相邻基坑施工时的相互影响分析[J].建筑施工,2008,30(10): 869-871. [8] 袁运涛,李苏春,雷秋生.深大异步联合基坑支撑优化及实测分析[J].水利与建筑工程学报,2011,9(5): 91-95. [9] 江苏省纺织工业设计研究院有限公司.苏州信托大厦岩土工程详细勘察报告[R].苏州: 江苏省纺织工业设计研究院有限公司,2009.
点击查看大图
计量
- 文章访问数: 78
- HTML全文浏览量: 10
- PDF下载量: 74
- 被引次数: 0