THE CONSTRUCTION TECHNOLOGY OF PRESTRESSED STEEL STRUCTURE FOR SIYANG STADIUM
-
摘要: 体育场位于江苏省泗阳县内,屋盖采用预应力斜拉结构。通过Midas/Gen软件分析得到设计张拉索力,并对施工过程进行仿真计算分析。介绍钢结构安装、预应力拉索安装及张拉等施工过程。根据工程特点,提出采用同一根柱子上前、后拉索同时张拉的施工方法,并对张拉过程中拉索索力、结构竖向变形等进行施工监测,结合施工仿真计算结果,提出监测结果的合理性和正确性,为钢结构和预应力施工方法提供依据。Abstract: The stadium was built in Siyang County of Jiangsu Province.The cable stayed gridding structure is used forthe stadium.The designed tensile force was gained from the calculation software of Midas/Gen.And the simulationcalculation was carried out in detail according to the construction course.The construction course of steel and cablewas introduced.According to character of this project, the construction methods of tensioning the front and backcables of the same pillar in the same time were provided.The cable force and the distortion were monitored in thecourse of construction.According to the construction simulation results, the rationality and correctness of constructionmonitoring were proposed.Which provided a basis for the methods of steel construction and prestressed construction.
-
[2] CECS180∶2005预应力钢结构技术规程[S]. 陆赐麟,尹思明,刘锡良.现代预应力钢结构[M].北京:人民交通出版社,2003. [3] GB502052001钢结构工程施工质量验收规范[S]. [4] 王泽强,秦杰.印度尼西亚全运会主体育场预应力钢结构施工技术[J].工业建筑,2008,38(12):8-11. [5] 王泽强,秦杰.金沙遗址采光顶预应力悬索结构设计与施工[J].工业建筑,2008,38(12):26-29. [6] 沈斌,秦杰.天津滨海国际会展中心(二期)预应力钢结构施工技术[J].施工技术,2008,37(4):59-60. [7] 尤德清,王泽强,陈新礼.营口体育场吊挂结构预应力施工技术[C]∥全国钢结构学术年会论文集.北京:中国钢结构协会,2011:532-537. [8] 王泽强,秦杰.2008年奥运会羽毛球馆弦支穹顶结构预应力施工技术[J].施工技术,2007,36(11):9-11. [9] 秦杰,王泽强.2008年奥运会羽毛球馆预应力施工监测研究[J].建筑结构学报,2007,28(6):83-91. [10] 杜彦凯,刘敏敏.连云港体育馆弦支穹顶预应力张拉技术研究[C]∥2009预应力上海论坛学术论文集.上海:2009:541-548.
点击查看大图
计量
- 文章访问数: 103
- HTML全文浏览量: 4
- PDF下载量: 129
- 被引次数: 0