ANALYSIS AND REINFORCING TREATMENT OF A FLOATING UNDERGROUND GARAGE
-
摘要: 针对新建的与2个相邻小高层住宅建筑相连的地下车库出现上浮、主要结构构件产生裂缝、混凝土压碎等破损现象的事故,通过现场实测和分析,发现事故产生的主要原因:勘测未给出正确的地下水位,从而导致未进行抗浮设计;其次,工程进度未如期完成,应该增加的配重未如期到位,从而加剧了结构破坏。针对分析结果,采用了降水和配重相结合的抗浮措施处理事故,同时对已产生破损的构件采用加大截面、粘钢等方法进行加固,效果良好。该事故分析处理经验可供类似工程借鉴。Abstract: In this paper,a floating underground garage,which connects with two multi rise residential buildings,was researched because concrete cracks or crushes occurred on the main members.Through monitoring and investigation on site,the reasons which caused the accidents and the failure mechanism were found that firstly,anti floating design was not carried out due to the wrong peak value of underground water level,which was less than bottom elevation of basement floor;secondly,because the progress of project wasn't completed on schedule,the benefit additional mass was not placed at the correct locations on time so as to make the damage of the members more seriously.Based on the results of monitoring and analysis,the combination of lowering the water level and adding additional mass was applied to deal with the incident,simultaneously,the damaged members were strengthened with RC and externally bonded steel plate.After the reinforced treatment was carried out,the performance of underground garage was good.The experience can be useful for similar projects.
-
Key words:
- underground garage /
- folating /
- analysis of accident /
- reinforce
-
景旭成,穆保岗. 某单层地下室上浮事故分析及处理[J].江苏建筑,2010,(02):86-90. 徐春国. 地下室上浮开裂事故的鉴定与加固处理[J].建筑结构,2002,(11):26-28. 刘文竞,杨建中,王霓. 某地下室上浮事故的检测鉴定及加固处理[J].工业建筑,2010,(06):127-130. 陈大川,唐利飞,张成强. 某体育馆地下室上浮事故的分析及加固处理[J].工业建筑,2010,(06):123-126. 建筑地基基础设计规范[S].2002. 既有建筑地基基础加固技术规范[S].2000. 岩土锚杆(索)技术规程[S].2005. 混凝土结构加固设计规范[S].2006. 混凝土结构设计规范[S].2002. 林宁东. 某厂房结构加大截面法加固实例[J].工业建筑,2005,(增刊):931-934.
点击查看大图
计量
- 文章访问数: 86
- HTML全文浏览量: 5
- PDF下载量: 75
- 被引次数: 0