NUMERICAL SIMULATION OF THE EFFECT OF DOUBLE-O-TUBE SHIELD TUNNEL CONSTRUCTION ON ADJACENT MASONRY BUILDINGS
-
摘要: 采用三维MIDAS/GTS软件,考虑建筑物-土体-隧道共同作用,模拟了双圆盾构隧道垂直穿越墙下筏基砌体结构建筑物的工况,研究隧道施工引起的建筑物附加沉降及荷载,考虑隧道水平位置及墙体层数改变的影响。分析结果表明:随着双圆盾构机穿越建筑物,建筑物的沉降量逐渐增大,完全通过以后建筑物沉降趋于稳定并略有回弹;沿隧道掘进方向的建筑物产生短期不均匀沉降,先从零逐渐增大,随后逐渐减小并趋于零;构件第一主应力最大值1和墙体最大剪应变均逐渐增大并趋于稳定。随着隧道轴线与建筑物轴线水平距离从零开始增大,建筑物呈现向隧道一侧倾倒的趋势,基础局部倾斜先增大、后减小;在一定范围内,1最大值和最大剪应变基本保持不变,超出后逐渐减小,并接近初始值。随着建筑物层数的增加,墙体最大剪应变呈线性增长,对建筑物造成轻微的损害。Abstract: Considering the interaction of building-soil-tunnel,the raft foundation masonry structure was vertically crossed by double-O-tube(DOT) shield tunnel,which was simulated by the 3D MIDAS/GTS software.The additional settlement and force of structure caused by tunnel construction were analyzed,and the changes of building's floor and the axis distance between building and shield tunnel were considered.The results showed that during the passage of the DOT shield tunnel through the building,the settlement of the building increased;the settlement was stable and had a little rebound when shield machine passed the building;the building had short uneven settlement in driving direction,and it increased first from zero then gradually decreased to zero;the maximum first principal stress 1 and the wall maximum shear strain increased and then was stable.With the increase of axis distance between building and tunnel,the building tended towards to tunnel side,the incline of local foundation increased first and then decreased;the maximal 1 and the maximal shear strain were all remained unchanged within a certain range,and then gradually decreased gradually and approached to their initial value.With the increase of building's floor,the maximal shear strain linearly increased,and it would cause minor damage to the building.
-
Key words:
- DOT shield tunnel /
- masonry structure /
- finite element method /
- settlement
-
吕虎,张庆贺. 地铁双圆盾构施工引起的地面沉降模型[J].建井技术,2006,(01):32-34. 陈昊. 双圆盾构隧道地表沉降分析[D].上海:上海交通大学,2007. 孙统立. 多圆盾构施工扰动土体位移场特征及其控制技术研究[D].上海:同济大学,2007. 周文波. 双圆隧道施T对环境的影响[J].上海建设科技,2004,(06):36-37. Mroueh H,Shahrour I. A Full 3-D Finite Element Analysis of Tunneling-Adjacent Structures Interaction[J].Computers and Geoteehnics,2003.245-253. Richard J,Finno,Frank T. Evaluating Damage Potential in Buildings Affected by Excavations[J].Journal of Geotechnical and Geoenvironmental Engineering,2005,(10):1199-1210. 彭畅,圾雨林,骆汉宾. 双线盾构施工对邻近建筑物影响的数值分析[J].岩石力学与工程学报,2008,(增2):3868-3874. 毕继红,江志峰,常斌. 近距离地铁施工的有限元数值模拟[J].岩土力学,2005,(02):277-282. 刘振宇,叶燎原,潘文. 等效体积单元(RVE)在砌体有限元分析中的应用[J].工程力学,2003,(02):31-35. 魏纲,张世民,齐静静. 盾构隧道施工引起的地面变形计算方法研究[J].岩石力学与工程学报,2006,(增1):3317-3323. 丁智. 盾构隧道施工与邻近建筑物相互影响研究[D].杭州:浙江大学,2007. C-B50007--2002建筑地基基础设计规范[S]. CB50003--2001砌体结构设计规范[S]. Boscardin M D,Cording E G. Building Response to Excavation Induced Settlement[J].Journal of the Geotechnical Engineering,1989,(01):1-21.
点击查看大图
计量
- 文章访问数: 99
- HTML全文浏览量: 2
- PDF下载量: 134
- 被引次数: 0