KEY TECHNICAL ISSUES ANALYSIS OF THE ADVERSE IMPACTS ON THE NEAR BUILDINGS IN SHANGHAI CHENSHAN BOTANICAL GARDEN CAUSED BY THE TALL FILL
-
摘要: 辰山植物园建筑物邻近需要大规模高填土的区域,这在上海软土地区极为鲜见,没有成熟的经验可供借鉴;结合辰山植物园高填土设计和施工,针对软土地基上高填土对相邻建筑物的不利影响进行详细研究;根据试验坝段监测资料反演土层计算参数,确保数值模拟的可靠性;明确提出填土较高、工期较短时类似工程的地基处理方法及工序要求;重点就相应有效防治措施进行深入分析,并与全过程工程监测结果对比及验证。Abstract: Tall fill was needed close to buildings in Shanghai Chenshan Botanical Garden.The project was done in Shanghai where there was little referred project experience.Based on this project design and construction,the adverse impacts on the near buildings caused by the tall fill was studied in detail.The calculation parameters of the soils were achieved from the experiment dam,and the simulation analysis was rather accurate.The construction management plan was presented for the tall fill project and the measures implemented with great efficiency were obtained.At one time,the simulation results were contrasted with the full process testing data.
-
[2] 上海申元岩土工程有限公司.上海辰山植物园岩土工程勘察报告[R].上海:上海申元岩土工程有限公司,2006. 宗劲松,张皓,咸珣.激情,求解于绿色上海辰山植物园建筑设计[J].工业建筑,2011,41(11):1-5. [3] 李亚明,贾水钟,蔡兹红,等.辰山植物园高填土对科研中心建筑不利影响控制措施的研究[J].工业建筑,2011,41(11): 11-15. [4] 贾水钟.减沉路堤桩在辰山植物园高填土设计中的应用与研究[J].工业建筑,2011,41(11):25-29. [5] 刘玉卓.公路工程软基处理[M].北京:人民交通出版社, 2003. [6] 吴邦颖?张师德,陈绪禄.软土地基处理[M].北京:中国铁道出版社,1993. [7] 刘心远,雷用,康景文.边坡工程设计监测鉴定及加固[M].北京:中国建筑工业出版社,2007. [8] 贾水钟,李伟,李亚明,等.辰山植物园主入口建筑西侧高填土不利影响的消减措施[J].工业建筑,2011,41(11):20-24. [9] 李伟,贾水钟,李亚明,等.高填土对辰山植物园主入口不利影响消减措施的数值模拟及工程实测[J].工业建筑,2011,41(11):16-19. [10] 周晓峰,张良兰,胡佳轶,等.辰山植物园温室铝合金结构设计[J].工业建筑,2011,41(11):30-35,52. [11] 李亚明,周晓峰,张良兰.辰山植物园温室铝合金结构滑动支座试验[J].工业建筑,2011,41(11):36-41. [12] 李亚明,李伟,贾水钟,等.辰山植物园展览温室基础设计[J].工业建筑,2011,41(11):42-44.?
点击查看大图
计量
- 文章访问数: 120
- HTML全文浏览量: 5
- PDF下载量: 92
- 被引次数: 0