REINFORCEMENT DESIGN OF CHIMNEY OF NANSHI POWER PLANT
-
摘要: 以改建的钢筋混凝土高耸结构原南市电厂烟囱作为研究对象,以上海2010年世博会观光塔这一典型的钢筋混凝土筒体结构作为工程背景,介绍改建加固的结构方案以及结构改造的内容,详细说明结构改建加固设计的做法,并计算分析加固前、后结构的主要计算指标,验算并对比结构改建前后的承载能力极限状态及正常使用状态下的各个指标,并就指标进行分析,比较结构改造加固的效果。Abstract: Based on reconstructing the RC chimney of the former Nanshi Electric Power Plant,which is a typical RC tube structure,into a sightseeing tower for 2010 Shanghai World Expo,it is presented the structural reinforcement scheme and reform contents,and it is described in detail the design of reinforcement and reform of the stucture. It is calculated the main indexes of the structure before and after the reinforcement. It is also checked and compared the indexes of the bearing capacity at ultimate state and normal service state for the structure before and after the reinforcement,through which the reinforcement effect was analyzed.
-
Key words:
- reinforced concrete /
- rebuilding /
- reinfoecement /
- chimney /
- high-rise structure
-
[2] GB 500112001 建筑结构抗震设计规范[S]. GB 500682001 建筑结构可靠度设计统一标准[S]. [3] DGJ 0892003 建筑抗震设计规程[S]. [4] GB 501352006 高耸结构设计规范[S]. [5] GB 500512002 烟囱设计规范[S] [6] GB 500092006 建筑结构荷载规范[S]. [7] GB 500102002 混凝土结构设计规范[S] [8] 黄涛,张晓光.改建烟囱的地震响应分析[J].工业建筑,2008,38(增刊):419-421. [9] 何天森,巢斯.高耸结构静力弹塑性分析研究[J].结构工程师,2011(4):45-50.
点击查看大图
计量
- 文章访问数: 101
- HTML全文浏览量: 10
- PDF下载量: 67
- 被引次数: 0