AUTOMATIC EMPLACEMENT CONSTRUCTION METHODS OF LARGE SINGLE-LAYER PLANE CABLE NET CURTAIN WALL BASED ON FORM-FINDING ANALYSIS
-
摘要: 针对大尺度单层平面索网幕墙施工中常用的配重施工法存在的多种弊端,通过深入分析竖索在施工过程中的弹性变形规律,基于前期研究提出的改进非线性逆迭代面内找形方法,灵活运用配重施工方法的原理,结合现场可操作性,形成了一种适用于单层平面索网幕墙的自平直施工方法。该施工方法通过增加结构施工模拟分析,取消了配重,实现相同竣工效果,却节省了大量施工成本,减少了安全隐患。工程应用表明,自平直方法完全可以替代配重施工法,适用性更强、更经济、简单、安全,具有较强的可操作性和显著的优越性。Abstract: Counterweight construction method, which is commonly used in installation of a large single-layer planecable net curtain wall, has lots of disadvantages. It is intended to present a new method to overcome theseshortcomings. The elastic deformation in the construction process of the vertical cable is deeply analyzed. Based onthe improved form-finding method with nonlinear inverse iteration that was proposed in preliminary study, anautomatic emplacement construction method for single-layer plane cable net curtain wall is brought forward. Theproposed method combines the principles and the fundamental purposes of the counterweight method, as well as thefeasibility of the construction site. This construction simulation-based method without counterweight can achieve thesame effect as the counterweight method, so as to save a lot of construction costs and reduce security risks. Thepractice applications show that the self-horizontal and self-vertical construction method can completely replace thecounterweight construction method, which has strong feasibility and significant superiority in application because it isa more economic, safer and simpler method.
-
[2] 王德勤.单层索结构在建筑幕墙中的应用[J].建筑技术,2004,35(9):677-678. 翁振江,单建,尹凌峰,等.考虑轴向荷载影响的预应力竖索结构解析理论研究[C]∥第十三届空间结构学术会议论文集.深圳: 2010: 236-242. [3] 翁振江,单建,尹凌峰,等.单层平面索网结构的找形分析[J].建筑结构,2011,41(3):14-18. [4] 翁振江,尹凌峰,单建,等.考虑轴向荷载影响的预应力单索静力解析方法[J].工程力学,2011,28(9):165-173. [5] 王元清,孙芬,石永久,等.点支式玻璃建筑复杂单层索网体系的设计及预应力控制技术分析[J].工业建筑,2005,35 (2) :32-35. [6] 李谦,尚仁杰,罗俊杰,等.中关村文化商厦玻璃平面单层索网张拉与控制[J].施工技术,2008,37(3):93-95.
点击查看大图
计量
- 文章访问数: 73
- HTML全文浏览量: 2
- PDF下载量: 94
- 被引次数: 0