ANALYSIS OF NEGATIVE PRESSURE DISTRIBUTION OF VERTICAL DRAINAGE CHANNELS FOR STABILIZATION OF ROADBED BY VACUUM PRELOADING
-
摘要: 在其他条件都相同的前提下,将线形、抛物形形、指数曲线形负压分布模式分别应用于京沪高速铁路真空预压试验段竖向排水通道中。运用有限单元法模拟现场地质和施工情况,计算路基固结过程,并将沉降计算结果和坡脚处水平位移计算结果与实测值进行对比分析。对三种分布模式计算结果与实测值的差异原因进行分析,分析发现:竖向排水通道负压分布沿通道由上至下按线性分布假定,即从某一个特定值的方法按线性折减到零或某个特定值的方法不十分符合实际,将导致数值分析的计算结果与实际差距较大。建议在淤泥中,竖向排水通道负压分布采用指数曲线形分布,但在硬壳层深度范围内的竖向排水通道负压分布模式可按线性模式进行设置。Abstract: Three negative pressure distribution modesline mode,parabola mode and exponent mode were respectively applied in the vertical drainage channels of the vacuum preloading test section of Beijing-Shanghai High-Speed Railway under identical conditions.Finite element simulation was made in calculation of the consolidation process of roadbed.The calculation results were compared with measured data.Differences of calculation results were found with the above mentioned three distribution modes.Reasons causing the differences between calculation results and measured data of the three distribution modes were analyzed.Analysis results show that,it is not very rational that negative pressure linearity-decrease from one value to zero or the other value along up-to-down vertical drainage channels.This will cause too much difference between calculation results and measured values.The negative pressure distribution mode of exponent type is commended to apply in silts.But the negative pressure distribution mode of line type is available to the vertical drainage channels in crust up silt.
-
[2] 雷鸣,王星华,夏力农.真空预压数值分析中竖向排水通道的讨论[J].铁道学报,2009,31(1):78. 龚晓南,岑仰润.真空预压加固地基若干问题[J].地基处理,2002,13(4):11. [3] 岑仰润.真空预压加固地基的试验及理论研究[D].浙江:浙江大学,2003. [4] 谢康和.砂井地基固结理论数值分析与优化设计[D].浙江:浙江大学,1987. [5] Biot A.General Theory of Three-Dimensional Consolidation[J].J.of Applied Phys.,1941(12). [6] 赵维炳,陈永辉,龚友平.平面应变有限元分析中砂井的处理方法[J].水利学报,1998,29(6). [7] 《地基处理手册》编写委员会.地基处理手册[M].北京:中国建筑工业出版社,1988. [8] JGJ 79-2002 建筑地基处理技术规范[S]
点击查看大图
计量
- 文章访问数: 104
- HTML全文浏览量: 9
- PDF下载量: 53
- 被引次数: 0