DESIGN AND STRUCTURAL ANALYSIS OF AN OVERLENGTH BASEMENT CONCRETE STRUCTURE WITHOUT EXPANSION JOINT
-
摘要: 对沈阳某超长地下室混凝土结构的温度应力进行有限元计算分析,探讨了设置与不设置后浇膨胀加强带两种情况下地下室底板、顶板和外墙温度应力的大小和分布,并提出四种方案对施工二阶段的温度应力进行控制。结果表明,设置后浇膨胀加强带后施工一阶段的温度应力有了明显的减小,施工二阶段在方案四下的温度应力减小效果显著。通过合理设置后浇膨胀加强带和温度收缩钢筋,采用补偿收缩混凝土,采用方案四对施工二阶段进行控制及在环境温差、材料、混凝土生产技术和施工等角度做好控制,本超长地下室可不设置伸缩缝。Abstract: It is studied the temperature stress of an overlength basement concrete structure in Shenyang by finite computing software.It is also explored the characteristics of temperature stress of the base board,floor and exterior wall with and without the post-pouring strengthening band.And four schemes are put forward to control the temperature stress of the second construction stage.The results show that the temperature stress of the basement with the post-pouring strengthening band according to the schemg decreases obviously.The conclusion shows that expansion joint may not be set on the overlength basement through setting the post-pouring strengthening band and temperature shrink reinforce ment reasonably,adopting the shrinkage-compensating concrete,adopting the fourth scheme to control the second construction stage,along with doing a good job in temperature difference,materials,production technology of concrete and construction.
-
GB 500102002 混凝土结构设计规范[S]. [2] 王铁梦.工程结构裂缝控制[M].北京:中国建筑工业出版社,1997:5-6. [3] 冯健,吕志涛,吴志彬,等.超长混凝土结构的研究与应用[J].建筑结构学报,2001,22(6):14-19. [4] 李志磊,干钢,唐锦春.超长框架结构在温度场作用下的空间变形特性和内力研究[J].工业建筑,2004,34(4):36-39. [5] 郑毅敏,刘永璨,卢宇航,等.某体育场环形超长结构温度应力分析[J].结构工程师,2007,23(4):30-34. [6] 宋伟,袁勇.高层建筑现浇超长地下室应力发展分析[J].特种结构,2002,19(1):20-23. [7] 游宝坤,李乃珍.膨胀剂及其补偿收缩混凝土[M].北京:中国建材工业出版社,2005. [8] 徐荣年,徐欣磊.工程结构裂缝控制王铁梦法应用实例集[M].北京:中国建筑工业出版社,2005. [9] GB 501352006 高耸结构设计规范[S]. [10] 《建筑设计资料集》(第二版) 总编辑委员会.建筑设计资料集:第2 集[M].2 版.北京:中国建筑工业出版社,1994:194. [11] 庄茁,张帆,岑松,等.ABAQUS 非线性有限元分析与实例[M].北京:科学出版社,2005:418.
点击查看大图
计量
- 文章访问数: 66
- HTML全文浏览量: 3
- PDF下载量: 146
- 被引次数: 0