FINITE ELEMENT ANALYSIS OF BEARING CAPACITY AND FAILURE MECHANISM OF HORIZONTAL JET GROUTING ARCH
-
摘要: 基于水平旋喷拱棚的原位荷载试验成果,利用试验数据对有限元分析结果进行验证,表明有限元计算结果是可信的。在此基础上,对水平旋喷拱棚在外部荷载作用下的塑性变形和破坏面的形状进行计算分析,结果表明:拱棚的塑性变形首先出现在水平旋喷所成的水泥土桩体结合处,随外部荷载的增大,塑性变形区域在水泥土桩体结合处逐渐扩展并最终形成一个贯通的塑形区。Abstract: The in-situ loading test was performed and the experimental data were used to verify the computational results from the finite element methods,which showed that the finite element program was reliable.By virtue of numerical analysis,the failure process can be reproduced.It is found that the plastic strains firstly appear on the junctions of cement mixing piles by horizontal jet grouting.With increasing of the load,the plastic zone expands and joints together at last.
-
[2] Esters K.HDI-Horizontal als Sicherungsschirm im Tunnelbau[C]∥Tunnelbau im Rhein-Ruhr-Gebiet.Essen,Deutschland:Universitaet GHS Essen,1991. Tomaghi R,Perelli C A.Soil Improvement by Jet Grouting for theSolution of Tunneling Problems[C]∥ Proceedings of the 4thInternational SymposiumTunneling 85.England: 1985. [3] 小委員会連セシナ一.高压ジエシトフォアパイリソグ(2)MJS(メトロジェットシステム) 工法[J].トニネルと地下,1995,26(7):77-84. [4] 朱庆林.水平旋喷[C]∥ 第二届全国地基处理学术讨论会论文集.北京:中国建筑工业出版社,1989:435-443. [5] 李相然,贺可强.高压旋喷注浆技术与应用[M].北京:中国建材工业出版社,2007. [6] 王梦恕.地下工程浅埋暗挖技术通论[M].合肥:安徽教育出版社,2004. [7] Liu Zhong,Zhang Huile.An Experimental Research on Full ScaleTunnel Jet Grouting Arch [C]∥ New Development in RockMechanics and Engineering,Sanya,China: 2009:477-484. [8] 刘钟,柳建国.隧道全方位高压喷射注浆拱棚超前支护新技术[J].岩石力学与工程学报,2009,28(1):59-65. [9] 孙星亮,刘勇,王朝建.国内外水平旋喷注浆加固技术的应用发展[J].探矿工程(岩土钻掘工程),2001(1): 8-11. [10] 孟凤朝.深圳地铁大- 科区间隧道水平旋喷桩施工技术[J].铁道工程学报,2003,78(2). [11] 刘勇,孙星亮,朱永全,等.水平旋喷预支护技术在铁路隧道中的应用[J].岩石力学与工程学报,2002,21(6):905-909. [12] 李远宁,段玉刚,吴胜.浅埋软弱地层隧道旋喷预衬砌支护技术的研究[J].探矿工程(岩土钻掘工程),2001(5):58-61.
点击查看大图
计量
- 文章访问数: 106
- HTML全文浏览量: 7
- PDF下载量: 134
- 被引次数: 0