THE INFLUENCE OF OFF-CENTER HITTING ON THE SIGNALS IN HIGH STRAIN DYNAMIC TEST
-
摘要: 在高应变动力试桩时,若锤重心与桩顶没有对中或落锤装置架不竖直,极容易导致偏心敲击,从而对锤体、桩侧的传感器信号产生很大的影响。基于两种不同的传感器安装方法,对高应变试桩时偏心敲击进行仿真研究,详细分析两种高应变测力方式的合理性以及正确的安装方案,重点研究偏心碰撞对各部位速度及应变的影响。通过仿真计算解释实践中出现的诸如偏心严重影响应变、较少影响速度等现象,更正了过去一直认为的大桩需要安装更多传感器才能克服偏心影响等观念。Abstract: It is very easy to lead to off-center hitting when the gravity center of hammer and the top of the pile is not right or the drop hammer device frame is not vertical in a high strain dynamic test,which then produces a significant impact on the signals of sensors that are on a hammer and the side of a pile. This paper made simulation study of offcenter hitting for high strain dynamic test piles based on two different installation methods of sensors; it was analyzed in detail the reasonableness of two kinds of high strain dynamic tests and their correct installation schemes with an emphasis on the effects of off-center hitting to the speed of each part and strain of the pile. The simulation explains the phenomena found in the practice such as the strain severely affected by off-center hitting,and less impact on the speed,which corrects the misconception that big piles need more sensors to over the impact of the off-center hitting.
-
Key words:
- dynamic test of pile foundation /
- hammer /
- high strain /
- off-center hitting /
- sensor
点击查看大图
计量
- 文章访问数: 81
- HTML全文浏览量: 5
- PDF下载量: 71
- 被引次数: 0