THE CONSTRUCTION MONITORING TECHNIQUE OF CAST-IN-SITU CANTILEVER RIGID FRAME BRIDGE
-
摘要: 悬臂现浇连续刚构桥的施工监控方法,主要包括结构计算、现场数据采集、参数识别、修正模型、指导施工等几个要素。监控具体通过现场数据采集、修正模型,得到有用数据、下达施工指令来保证实现桥梁成桥后的设计状态。结合马梧高速公路大坡桂江大桥工程实例,简要给出了桂江大桥的监控示例。实测数据表明,大桥监控取得了良好效果。Abstract: The construction monitoring method of cast-in-situ cantilever rigid frame bridge is introduced,which includes structure analysis,data collection in field,parameter identification,model modifying and construction instruction. By data cellection in field,model modifying,command-giving,the designing status of the bridge is guaranteed. Taking the Dapo Guijiang bridge of Majiang-Wuzhou Expressway Project for example,it is introduced the monitoring method. The measured data show that excellent effect has been got by the monitoring method.
-
[2] 黄建跃,王树林. 大跨度连续刚构桥施工主梁变形监测的必要性与方法[J]. 桥梁建设,2003(1) :48-51. 武芳文,方辉,赵雷. 大跨度连续刚构桥施工阶段应力监测分析[J]. 铁道建筑,2005(9) :6-8. [3] 彭东黎,余钱华. 大跨高墩连续刚构桥施工期主梁变形监测[J]. 公路与汽车,2006,112:109-111. [4] 彭福明,张新山,张宁,等. 新增钢梁与混凝土结构连接节点的有限元分析[J]. 工业建筑,2009,39(7) :115-117.
点击查看大图
计量
- 文章访问数: 94
- HTML全文浏览量: 5
- PDF下载量: 65
- 被引次数: 0