CONSTRUCTION TECHNOLOGY OF MASS CONCRETE FOR CUSHION CAP AND COLUMN BASE OF SHANGHAI YANGTZE RIVER TUNNEL AND BRIDGE
-
摘要: 上海长江隧桥承台、塔座大体积混凝土的施工,采用了料控、温控、浇筑控等施工措施。其中,温控是控制大体积混凝土开裂、保证混凝土施工质量的关键工艺;而在大体积混凝土中埋设冷却水管进行降温是降低混凝土早期水化热升温的有效措施,在施工实践中取得了较好的效果,可以为类似工程提供参考。Abstract: The controls of materials,pouring and temperature are used for mass concrete construction for cushion cap and column base of Shanghai Yangtze River Tunnel and Bridge. Among them,temperature control is the critical technology to control the mass concrete cracking,and to ensure the quality of concrete?construction,while burying cooling water pipe in concrete is the effective measure to lower the temperature of concrete hydration heat at early age. Better results are got during construction,which provides a reference for similar projects.
-
刘吉士,张俊义,陈亚军.桥梁施工百问[M].北京:人民交通出版,2006. [2] 刘吉士,阎洪河.公路桥涵施工技术规范实施手册[M].北京:人民交通出版,2004. [3] 徐伟,苏宏阳,金福安.土木工程施工手册上册[M].北京:中国计划出版社,2003. [4] JTJ 0412000公路桥涵施工技术规范[S]. [5] 刘伟,董必钦,李伟文,等.大体积混凝土的温度应力分析及温度裂缝研究[J].工业建筑,2008,38(7):79-81.
点击查看大图
计量
- 文章访问数: 74
- HTML全文浏览量: 5
- PDF下载量: 72
- 被引次数: 0