THE DESIGN OF THE INTEGRAL LIFT-UP FOR THE CONSERVATION OF THE JADE EMPEROR PAVILION OF KAIFENG YANQING TAOIST TEMPLE
-
摘要: 砖石古建筑的整体顶升保护工程目前尚无专门的设计规范、规程。对开封元代砖石建筑延庆观玉皇阁的整体顶升保护工程,介绍了其关键性技术,包括:结构预加固、水泥深层搅拌桩阻水、箱梁顶进、坑式静压钢管桩托换与预压、整体顶升与纠偏等五个方面,并提出有关建议和具体实施措施。Abstract: There is no special design method and code for the design of the holistic lifting-up for the conservation of the masonry ancient construction.The design method and process of the integral lift-up for the conservation of the Jade Emperor Pavilion of Kaifeng Yanqing Taoist Temple are introduced,which included such enhineering methods as reinforcement,high pressure jet grouting piles, pipe-jacking,jacked steel piles and preloaded piles,integral lift-up etc.Some suggestions and specific measures are put forward.
-
Key words:
- masonry ancient construction /
- the holistic lifting-up /
- conservation
-
[2] 水利部黄河水利委员会.黄河水利史述要[M].北京:水利出版社,1982:209-215,236-239. 常青.元明中国砖石拱顶建筑的嬗变[J].自然科学史研究,1993(2):192-200. [3] 林福林.基坑水泥旋喷桩帷幕止水施工质量控制[J].福建地质,2007(26):193-198. [4] 余彬泉,陈传灿.顶管施工技术[M].北京:人民交通出版社,1998:72-84. [5] 颜纯文,蒋国盛,叶建良.非开挖铺设地下管线工程技术[M].上海:上海科学技术出版社,2005:83-89. [6] 韩选江.大型地下顶管施工技术原理及应用[M].北京:中国建筑工业出版社,2000. [7] 王建平,姚修文.静压桩托换技术应用中的几个问题探讨[J].工业建筑,1999,29(9):62-64. [8] JGJ 1232000既有建筑地基基础加固技术规范[S]. [9] 陈国政,赵来顺,陈守平.预压桩托换法和建筑物的顶升纠偏[J].土工基础,2003(12):29-32. [10] GB 500092001建筑结构荷载规范[S]. [11] 侯晓萌,郑文忠.哈尔滨银河大酒店增层改造设计[J].工业建筑,2008,38(4):109-112.
点击查看大图
计量
- 文章访问数: 101
- HTML全文浏览量: 6
- PDF下载量: 113
- 被引次数: 0